Terms of Use

By Abu Anns · Last updated 20 November 2026

Last updated: 20 November 2026

By using Cert Prep Club (the "Site"), you agree to these Terms of Use. If you do not agree, please do not use the Site.

What the Site provides

Cert Prep Club provides free study guides, practice questions, mock tests, and reference material for professional certification exams. All material is provided for educational purposes only. We are not affiliated with or endorsed by PMI, AWS, CompTIA, or any other certifying body, and nothing on this Site is official exam content.

Accuracy and no guarantee

We work hard to keep our material accurate — every question passes a four-pass verification process before publication, and we fix verified errors promptly (see our How we write and corrections pages). Even so, we cannot guarantee that any question, answer, or explanation is correct, complete, or up to date, and we cannot guarantee that using this Site will result in passing any exam. Exam syllabuses change; always check the official exam guide from the certifying body before your exam date.

Acceptable use

You may use the Site for your own personal study. You may not copy, republish, sell, or redistribute substantial parts of the Site's content without our written permission. You may not use the Site in any way that breaks the law, harms the Site or other users, or attempts to gain unauthorised access to any system.

Intellectual property

The text, questions, and design of this Site are the property of Cert Prep Club unless otherwise stated. Trademarks such as AWS, PMP, and CompTIA Security+ belong to their respective owners; their use here is only to identify the exams our material covers.

Links to other sites

The Site links to external websites, including the official pages of certifying bodies. We are not responsible for the content of external sites.

Limitation of liability

The Site is provided "as is", without warranties of any kind. To the fullest extent permitted by law, Cert Prep Club is not liable for any loss or damage arising from your use of the Site, including exam fees, travel costs, or lost time, even if we were advised of the possibility of such loss.

Changes to these terms

We may update these Terms of Use from time to time. When we do, we will update the "Last updated" date at the top of this page. Continued use of the Site after a change means you accept the updated terms.

Contact

Questions about these terms? Contact us at hello@certprepclub.com or through our contact page.

Advertisement