PMP Exam Details

Everything about the PMP exam: cost, passing score, format, retake policy, renewal, and how to book.

By Abu Anns · Last updated 20 November 2026Exam version: July 2026 ECO (current since 9 July 2026)

PMP exam details — the July 2026 exam

Everything on this page is verified against PMI's own sources (the PMP Examination Content Outline, July 2026, and PMI's PMP certification page) as of 20 November 2026. Fees change — always confirm the current figures on pmi.org before you pay.

Exam format

ItemDetail
ExamProject Management Professional (PMP), based on the July 2026 Exam Content Outline (ECO)
Questions180 (170 scored + 10 unscored pretest questions, not marked)
Duration240 minutes (4 hours), with two 10-minute breaks
BreaksFirst break after the case-study section (you cannot return to that section); second break roughly midway through the independent questions. Note: PMI’s pages differ on whether break time sits inside or outside the 240 minutes — pace for the tighter reading (about 73 seconds per question if breaks are included)
Question typesMultiple choice, multiple response, matching, hotspot, pull-down list, enhanced matching, case-study/scenario sets, graphic-based questions
DomainsPeople 33%, Process 41%, Business Environment 26% (26 tasks: 8/10/8)
Approach mixApproximately 40% predictive, 60% agile / adaptive / hybrid
Passing scoreNot published by PMI (pass/fail determined by psychometric analysis)
DeliveryPearson VUE test center or online proctored exam
LanguagesEnglish, Arabic, Brazilian Portuguese, Chinese (Simplified), Chinese (Traditional), French, German, Indonesian, Italian, Japanese, Korean, Polish, Russian, Spanish, Turkish (per PMI's PMP page; confirm your language when booking)
ResultPass/fail, with a performance breakdown by domain

The case-study section is new in the 2026 exam: it presents a longer scenario followed by several linked questions, testing applied judgment across a situation rather than isolated recall. Once you finish it and take the first break, the section locks — you cannot go back. Budget your time accordingly: 240 minutes across 180 questions is 80 seconds per question on average, and the case-study questions may take longer than the independent ones.

Cost

ItemCost (USD)
Exam fee — non-member$675 (since 6 August 2026)
Exam fee — PMI memberLower than the non-member rate — confirm the current figure on pmi.org (published sources disagree: $425 vs $445)
Retake — member / non-memberAbout $275 / $375 (confirm on pmi.org)
PMI membershipRoughly $150-$165 per year plus a one-time $10 application fee (confirm on pmi.org — PMI shows the price at checkout)
Renewal (every 3 years)$60 member / $150 non-member (per PMI's continuing certification handbook — confirm on pmi.org)

PMI raised exam fees on 6 August 2026, from $405 (member) and $555 (non-member) to the current figures. Many guides and cost pages still quote the old prices — if you see $405 or $555, the source is out of date. The member fee is genuinely disputed in published sources: some guides report $445, while others (including one that says it read PMI's US store in November 2026) report $425. PMI does not display the fee on its public PMP page, so we cannot resolve the dispute from PMI's public pages — check the price in your cart on pmi.org before you pay. Either way, membership usually pays for itself through the exam discount alone.

Eligibility

To apply, you need education plus experience leading projects, plus training:

Your educationExperience leading projects (within the last 10 years)
Secondary school diploma, GED, or equivalent60 months (5 years)
Associate's degree or recognized vocational / technical diploma48 months (4 years)
Bachelor's degree or higher36 months (3 years)
Bachelor's or postgraduate degree from a PMI Global Accreditation Center (GAC) program24 months (2 years)

All experience must be within the 10 years before you apply, in a professional setting, taking responsibility for planning, decisions, delivery, and outcomes. Overlapping projects count only once — two months leading two projects at the same time is two months, not four. You list each project separately on the application.

Training requirement: 35 hours of project management training, or an active CAPM certification (which satisfies the requirement). From 1 December 2026, live instructor-led classes (in person or online) count toward the 35 hours only if delivered by a PMI Authorized Training Partner (ATP), a China Registered Education Provider (REP), or an eligible accredited higher education program (including PMI GAC programs). Self-paced on-demand courses are unaffected by this rule. If you are relying on a live course from another provider, check its status before 1 December 2026.

Application and audit

You apply through pmi.org: create an account, enter your education and project experience, describe your 35 training hours, and submit. PMI usually reviews standard applications within about a week. Once approved, you pay the exam fee and receive an eligibility ID, which gives you a one-year window to schedule and sit the exam, with up to three attempts in that window.

Any application can be selected for audit, at random. If yours is audited, PMI asks for proof of your education, experience, and training — diplomas, contact details for people who can verify your project work, and training certificates. You have 90 days to provide the documents. The audit is not a sign of suspicion; it is a routine quality check. Keep your records organized from the start so an audit is an inconvenience, not a crisis.

If you use all three attempts in your eligibility window without passing, PMI requires a one-year wait from your last attempt before you can reapply. If your eligibility window expires without you passing, you must submit a new application.

How to book

After your application is approved and you have paid the fee, you schedule the exam through Pearson VUE (pearsonvue.com/pmi), choosing either a test center or an online proctored exam from home. For the online option, you need a quiet room, a webcam, a microphone, and a stable internet connection, and you will be monitored by a live proctor throughout the exam. For a test center, bring the identification Pearson VUE specifies when you book. You can reschedule within Pearson VUE's published window; check the current rescheduling rules when you book, as they change.

Maintaining your certification

The PMP is valid for three years. To renew, earn 60 professional development units (PDUs) in each three-year cycle — through education (courses, reading, webinars), giving back (teaching, volunteering, presenting, creating content), and working as a project manager — and pay the renewal fee ($60 member / $150 non-member, confirm on pmi.org). PMI requires a minimum number of education PDUs across the PMI Talent Triangle: ways of working, power skills, and business acumen. Track your PDUs in PMI's continuing certification system as you earn them, not at the end of the cycle. If your certification lapses, you must retake the exam to earn it back.

What changed in the 2026 exam (for candidates with older materials)

If you studied for the 2021 ECO, the main changes are: domain weights moved from People 42% / Process 50% / Business Environment 8% to 33% / 41% / 26%; the task list shrank from 35 to 26 tasks; risk, change control, governance, and issue management moved from Process to Business Environment; the exam is now 180 questions in 240 minutes (was 230 minutes) with 10 pretest questions (was 5); a case-study section opens the exam; and the approach mix shifted to about 40% predictive and 60% agile/adaptive/hybrid. The situational style and the PMI mindset — servant leadership, understand before acting — have not changed, and roughly 80% of the content carries over. The biggest study adjustment is to take Business Environment seriously: it is now more than a quarter of the exam.

Advertisement