AWS SAA Cheat Sheet

Quick-reference summary of the key facts for the SAA-C03 exam.

By Abu Anns · Last updated 20 November 2026Exam version: SAA-C03 (current)

Exam at a glance

Domain 1: Design Secure Architectures (30%)

Domain 2: Design Resilient Architectures (26%)

Domain 3: Design High-Performing Architectures (24%)

Domain 4: Design Cost-Optimized Architectures (20%)

S3 storage classes

ClassUse whenAvailabilityMin. duration
StandardFrequent access99.99%None
Intelligent-TieringAccess pattern unknown/changing99.9%None
Standard-IAInfrequent, needs instant access99.9%30 days
One Zone-IAInfrequent, re-creatable data99.5%30 days
Glacier Instant RetrievalArchive, quarterly access, ms retrieval99.9%90 days
Glacier Flexible RetrievalArchive, 1–2 accesses/year99.99%90 days
Glacier Deep ArchiveLong-term archive, rarely accessed99.99%180 days

Glacier retrieval: Flexible — Expedited 1–5 min, Standard 3–5 hrs, Bulk 5–12 hrs (free). Deep Archive — Standard within 12 hrs, Bulk within 48 hrs; no Expedited.

EBS vs EFS vs instance store

ServiceScopeShared?Survives stop?
EBSBlock, one AZOne instance (Multi-Attach: same-AZ instances, io1/io2)Yes
EFSFile (NFS), multi-AZYes, many instancesYes
Instance storeBlock, on hostNoNo — lost on stop/terminate/host failure
FSx for WindowsFile (SMB), AD-integratedYesYes

RDS vs Aurora vs DynamoDB

ServiceModelBest forScaling
RDSRelational (MySQL, PostgreSQL, Oracle, SQL Server, MariaDB)Traditional relational workloads, any engineRead replicas (5), vertical scaling
AuroraRelational, MySQL/PostgreSQL-compatibleHigh availability, many replicas, fast failover15 read replicas, auto storage to 128 TB
DynamoDBNoSQL key-value/documentMassive scale, single-digit-ms key lookupsAutomatic; on-demand or provisioned

Must-know numbers

Advertisement