Google ACE ACE Exam Prep
Free Google Cloud Certified – Associate Cloud Engineer study guides, practice questions with explanations, and a timed mock test — no signup, no paywall.
Google ACE exam facts
- Exam code
- ACE
- Exam version
- ACE (exam guide live 30 June 2026)
- Exam fee
- $125 USD
- Questions
- 50-60 (Google publishes a range, not an exact count) (real exam)
- Duration
- 120 minutes (real exam)
- Passing score
- Not published by Google — results are pass/fail only
Exam domains
How the real exam is weighted:
What is the Google Cloud Associate Cloud Engineer certification?
The Google Cloud Certified – Associate Cloud Engineer (ACE) is Google Cloud's entry-level hands-on engineering certification. It validates that you can deploy applications, monitor operations, and manage enterprise solutions on Google Cloud — the day-to-day work of a cloud engineer, rather than high-level architecture design. An Associate Cloud Engineer sets up cloud projects, deploys and configures compute, storage, and networking resources, keeps them running, and controls who can access them. If the Professional Cloud Architect exam asks you to design the system, the ACE exam asks you to build it and keep it healthy.
Google describes the role as someone who deploys and secures applications, services, and infrastructure, monitors the operations of multiple projects, and maintains enterprise solutions so they meet target performance metrics. The exam reflects that working reality: most questions are scenario-based, asking what you would do — which command, which console step, which service — rather than asking you to define terms. Hands-on practice in a real Google Cloud project matters far more for this exam than for most certifications, because the questions reward people who have actually performed the tasks.
Exam format at a glance
The standard exam lasts 2 hours and contains 50–60 multiple choice and multiple select questions. Google publishes that range rather than an exact count, and some questions have more than one correct answer — the question tells you how many to choose. There are no hands-on labs in the exam itself; it is entirely question-based, but the questions assume you have done the work in practice. The registration fee is $125 USD plus tax where applicable, and there are no formal prerequisites. Google recommends 6 or more months of hands-on experience with Google Cloud before attempting it.
Google does not publish a passing score. Results are reported as pass or fail only — you see a provisional result on screen when you submit, and the official result follows later. If you do not pass, Google provides a section-by-section breakdown in the candidate portal so you can see which areas were weakest, but no numeric score. Any specific percentage you see quoted online (often around 70%) is community folklore, not an official figure, so treat it as a rough floor rather than a target: aim to score comfortably above 80% on timed practice tests before you book.
The certification is valid for 3 years. You can renew by retaking the standard exam, by taking a shorter renewal exam (1 hour, 20 questions, $75 plus tax, available in English and Japanese), or — if you are within the last year of your certification's active period — by completing designated courses or skill badges in Google Skills, which renews the certification for 1 year. You can take the exam online with a remote proctor or onsite at a Pearson VUE testing center, in English, Japanese, Spanish, or Portuguese.
The four sections
The official exam guide organizes the exam into four sections, with approximate weights:
| Section | Weight | What it covers |
|---|---|---|
| Setting up a cloud solution environment | ~20% | Resource hierarchy, projects, Cloud Identity, billing accounts, budgets, quotas |
| Planning and implementing a cloud solution | ~30% | Choosing and deploying compute, storage, database, and network options; infrastructure as code |
| Ensuring the successful operation of a cloud solution | ~30% | Managing compute, storage, databases, and networking; monitoring and logging |
| Configuring access and security | ~20% | IAM roles and policies, service accounts, impersonation, short-lived credentials |
Planning and implementing and Ensuring the successful operation are the two largest sections at about 30% each — together about 60% of the exam. Planning and implementing is the most hands-on: it covers choosing and launching VMs, deploying GKE clusters and containerized applications, deploying serverless applications, loading data, and building VPCs. The sections overlap constantly in practice — a question about deploying an application will often hinge on the service account it runs as (security), the network it sits in (planning), and how you will monitor it (operations). Study the services in the context of real tasks, not as isolated feature lists.
Who is this certification for?
The ACE is aimed at cloud engineers, systems administrators, DevOps engineers, and developers who deploy and operate workloads on Google Cloud, and it is the usual first Google Cloud certification for anyone in a hands-on technical role. (The Cloud Digital Leader certification is the non-technical alternative for people in business or sales roles.) It is also a common first certification for career changers moving into cloud engineering, because it covers the breadth of the platform — compute, storage, networking, security, monitoring — without demanding deep specialization in any one area.
There are no formal prerequisites, and you do not need to hold Cloud Digital Leader first. The realistic preparation time is 4 to 8 weeks of steady study for someone with some IT background, or 2 weeks for a practitioner who already works with Google Cloud daily and mainly needs to learn the exam's style and fill gaps. Our study planner page lays out 2-week, 4-week, and 8-week plans matched to each starting point. Whatever your background, budget real lab time: Google offers free usage of many products up to monthly limits, plus $300 in free credits for new customers, which is more than enough to practice every task on this exam.
How to use this site to prepare
Each of the 14 study guides on this site covers one exam topic in depth — the resource hierarchy, billing, compute choices, storage choices, networking, Compute Engine, GKE, serverless, data solutions, operations, monitoring and logging, and IAM — with the concepts explained in plain language, comparison tables where services overlap, and a list of exam traps: the mistakes candidates most often make on that topic. Every guide ends with eight original practice questions written from the official exam guide objectives, each with a full explanation of why the correct answer is best and why the other options are wrong. The explanations are the learning; read them even when you answer correctly.
When you have worked through the guides, take the timed mock test: 50 questions drawn across all four sections in the exam's own weightings, scored by section so you can see exactly where to go back and re-study. The cheat sheet page is built for final revision in the last few days before the exam, and the glossary covers the terms and acronyms the exam uses. A realistic study rhythm is one guide per day with its questions and a short lab session to perform the tasks it describes, a mock test at the end of each week, and a final full review of your missed questions in the last week.
Career value
Google Cloud is the third-largest public cloud provider, and demand for engineers who can operate it has grown steadily as more organizations run production workloads there. The ACE is the credential hiring managers look for when they need someone who can be trusted with a real Google Cloud environment on day one — setting up projects properly, deploying workloads, and keeping them running. It is also the natural stepping stone to Google's professional certifications, particularly Professional Cloud Architect and Professional Cloud DevOps Engineer. Salary figures for Google Cloud engineers vary widely by role and experience; our salary page gives the current numbers with sources and dates.
Study guides
Projects & the Resource Hierarchy
Setting up a cloud solution environment
Billing, Budgets & Quotas
Setting up a cloud solution environment
Choosing Compute: GCE, GKE, Cloud Run, Cloud Functions
Planning and implementing a cloud solution
Choosing Storage & Databases
Planning and implementing a cloud solution
Planning Network Resources
Planning and implementing a cloud solution
Deploying Compute Engine
Planning and implementing a cloud solution
Deploying Google Kubernetes Engine
Planning and implementing a cloud solution
Deploying Cloud Run & Cloud Functions
Planning and implementing a cloud solution
Deploying Data Solutions
Planning and implementing a cloud solution
Deploying Networking & Infrastructure as Code
Planning and implementing a cloud solution
Managing Compute: GCE, GKE & Cloud Run
Ensuring the successful operation of a cloud solution
Managing Storage, Databases & Networking
Ensuring the successful operation of a cloud solution
Monitoring & Logging
Ensuring the successful operation of a cloud solution
IAM & Service Accounts
Configuring access and security
Frequently Asked Questions
How much does the Google Cloud Associate Cloud Engineer exam cost?
The standard exam costs $125 USD per attempt, plus tax where applicable. Each retake costs the full $125 again. The shorter renewal exam for already-certified holders costs $75 plus tax.
How many questions are on the ACE exam?
Google publishes a range, not an exact count: 50–60 multiple choice and multiple select questions in a 2-hour exam. Some questions have more than one correct answer, and the question tells you how many to choose.
What is the passing score for the ACE exam?
Google does not publish a passing score, and results are pass or fail only — you never see a number. If you fail, the candidate portal gives a section-by-section breakdown so you can see where to focus before a retake. Percentages quoted online (often around 70%) are unofficial community estimates, not Google figures.
How long does it take to prepare for the ACE exam?
Most candidates need 4–8 weeks of steady study (roughly 1–2 hours a day) plus hands-on lab time. Experienced Google Cloud practitioners can often prepare in 2 weeks by focusing on exam style and gap-filling. Complete beginners to cloud should allow 8–12 weeks. Our study planner page has week-by-week plans for 2-week, 4-week, and 8-week timelines.
How long is the Associate Cloud Engineer certification valid?
Three years from the date you pass. You can renew by retaking the standard exam, by taking the shorter 1-hour renewal exam ($75), or — in the last year of the certification — by completing designated Google Skills courses or skill badges, which renews it for 1 year. If the certification expires, you must take the standard exam again.
What happens if I fail the ACE exam? Can I retake it?
Yes, but Google's retake policy for associate exams is strict: a maximum of four attempts in a two-year period. After a first failure you must wait 14 days, after a second failure 60 days, and after a third failure 365 days. Each attempt costs the full $125. Use the section breakdown from a failed attempt to target your weakest sections before retaking.