A+ Core 1 Study Planner
A week-by-week study plan for the 220-1201 exam: 2-week, 4-week, and 8-week schedules.
How to use this planner
Core 1 has eight study guides. Pick the plan that matches your starting point, and study in guide order — the guides build on each other (networking before troubleshooting, hardware before printers). Each plan ends with a mock test and a review week. Study in focused sessions of 60–90 minutes rather than marathon sessions, and do the practice questions at the end of each guide the same day you read it.
2-week plan (experienced — you already work in IT support or build PCs)
Days 1–2: Mobile Devices + Ports, Protocols & Wireless. Drill the port table until you can recite it. Days 3–4: Network Services, Hardware & SOHO Setup + Hardware Components. Focus on RAID levels, RAM generations, and cable types. Days 5–6: Printers + Virtualization & Cloud. Days 7–8: Both troubleshooting guides — these are 28% of the exam, so read them twice. Day 9: Full timed mock test. Days 10–12: Re-study your weakest domains using the mock score breakdown, and re-do every question you got wrong. Days 13–14: Cheat sheet review, a second mock test, and rest the day before the exam.
4-week plan (some IT background — comfortable with computers, new to formal study)
Week 1: Mobile Devices, Ports & Protocols, Wireless. Two guides per week is a comfortable pace: read one guide, do its questions, then review the next day before moving on. Spend extra time on the port table and Wi-Fi standards. Week 2: Network Services & SOHO Setup, Hardware Components. Build a personal flashcard set for cables, RAM, and RAID. If you have an old PC, open it up and identify the parts. Week 3: Printers, Virtualization & Cloud, Troubleshooting Hardware. Week 4: Troubleshooting Network & Printer, then the full mock test. Use the remaining days to re-study weak domains and re-do missed questions, finishing with the cheat sheet.
8-week plan (complete beginner — little or no IT background)
Weeks 1–2: Mobile Devices and Ports, Protocols & Wireless, one guide per week. Go slowly: read each guide twice, look up every unfamiliar term in the glossary, and practise the hands-on skills (pair a Bluetooth device, find your IP address, identify the ports on your own computer). Weeks 3–4: Network Services & SOHO Setup and Hardware Components. Set up a home network from scratch if you can, and identify every cable and connector in the guide on real equipment. Weeks 5–6: Printers, Virtualization & Cloud, and Troubleshooting Hardware. Week 7: Troubleshooting Network & Printer, then your first full mock test. Week 8: Review week — re-study your two weakest domains, re-do all missed questions, review the cheat sheet daily, and take a second mock test mid-week. Book the exam for the end of week 8 so you have a firm deadline.
General advice
Do not skip the troubleshooting guides: at 28% of the exam, they are worth more than any other domain, and they are the hardest to cram. Do the practice questions under time pressure — the real exam gives you about one minute per question. And remember that Core 2 is a separate exam with its own study package at /aplus-core-2/: plan to start it within a week or two of passing Core 1, while your study habits are still in place.