AZ-305 Glossary

Key terms and acronyms for the AZ-305 exam, explained in plain language.

By Abu Anns · Last updated 20 November 2026Exam version: AZ-305 (skills measured as of 17 April 2026)

ABAC
Attribute-based access control: Azure RBAC extended with conditions based on resource attributes, such as blob tags.
AKS
Azure Kubernetes Service: Microsoft's managed Kubernetes platform for container orchestration.
APIM
Azure API Management: a gateway service for publishing, securing, and managing APIs.
App Service
Azure's platform-as-a-service hosting for web applications, APIs, and mobile backends.
ASR
Azure Site Recovery: replication-based disaster recovery for VMs and on-premises servers.
Availability set
A grouping of VMs across fault domains and update domains within a single datacentre.
Availability zone
A physically separate datacentre (or group) within an Azure region, with independent power, cooling, and networking.
Bastion
Azure Bastion: secure browser-based RDP/SSH access to VMs without public IP addresses.
CAF
Cloud Adoption Framework for Azure: Microsoft's methodology for cloud adoption, including landing zones and migration strategies.
CDN
Content delivery network: caches content at edge locations close to users to reduce latency.
Conditional Access
Microsoft Entra ID policy engine that enforces controls (MFA, device compliance, blocking) based on sign-in signals.
Cosmos DB
Azure's globally distributed multi-model database with single-digit-millisecond latency and five consistency levels.
DCR
Data collection rule: defines what the Azure Monitor Agent collects from machines and where it sends it.
DMS
Azure Database Migration Service: migrates databases to Azure with minimal downtime using continuous replication.
Entra ID
Microsoft Entra ID (formerly Azure Active Directory): Microsoft's cloud identity and access management service.
Event Grid
Azure's event routing service for discrete events, enabling event-driven architectures.
Event Hubs
Azure's big-data streaming ingestion service for millions of events per second.
ExpressRoute
A private, dedicated network connection between on-premises infrastructure and Azure.
Front Door
Azure's global layer-7 load balancer with anycast routing, caching, and WAF.
HSM
Hardware security module: dedicated hardware for protecting cryptographic keys.
KQL
Kusto Query Language: the query language for Log Analytics and Azure Data Explorer.
Landing zone
A pre-configured Azure environment with networking, identity, governance, and security ready for workloads.
Log Analytics
Azure Monitor's log storage and query service, based on workspaces and KQL.
Managed identity
An Entra ID identity managed by Azure for an Azure resource, removing the need for stored credentials.
NAT Gateway
Azure's managed outbound internet connectivity service for subnets, providing a static public IP and large SNAT port pool.
NSG
Network security group: filters network traffic to subnets and network interfaces using allow/deny rules.
PIM
Privileged Identity Management: just-in-time privileged role activation with approval and time limits.
Private endpoint
A private IP address inside a VNet that connects to a PaaS service via Azure Private Link.
RBAC
Role-based access control: Azure's authorisation system assigning roles to principals at a scope.
RPO
Recovery point objective: the maximum acceptable data loss, measured in time.
RTO
Recovery time objective: the maximum acceptable downtime after a disaster.
RU
Request Unit: the measure of throughput in Azure Cosmos DB.
Service Bus
Azure's enterprise message broker with queues, topics, ordering, and transactions.
SIEM
Security information and event management: centralised collection and analysis of security events (Microsoft Sentinel).
SLA
Service-level agreement: the availability target a service commits to, backed by service credits.
SOAR
Security orchestration, automation, and response: automated incident response, provided in Sentinel via playbooks.
Synapse
Azure Synapse Analytics: unified analytics service combining warehousing, Spark, and data integration.
TDE
Transparent data encryption: encrypts database data at rest.
Traffic Manager
Azure's DNS-based global load balancer with multiple routing methods.
UDR
User-defined route: a custom route table entry overriding Azure's default routing, commonly used for forced tunnelling.
VNet
Virtual network: the isolated network boundary in Azure.
WAF
Web Application Firewall: protects web applications from OWASP Top 10 attacks such as SQL injection and cross-site scripting.
Zone redundancy
Replication of a service or data across availability zones within a region.
Advertisement