A+ Core 1 220-1201 Mock Test

50 timed questions · 50 minutes · scored by domain, with re-study links for your weakest areas.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1201 (V15, current)

How it works: the timer starts as soon as this page loads. Answer each question, use the numbered dots to jump around, and flag questions to come back to. You see no feedback until you submit — just like the real exam. The pass guide is 70%: note that some vendors (including AWS) use scaled scoring and do not publish a percentage pass mark, so 70% is a study guide only.

50:00
Question 1 of 50

Q1.A technician is replacing a laptop keyboard. Which step should be done FIRST?

Report an error

Q2.A user's phone will not connect to the office Wi-Fi, but it connects to Wi-Fi at home. The user has confirmed the office password is correct. What should the technician check next?

Report an error

Q3.A technician needs to allow secure web traffic through a firewall but block unencrypted web traffic. Which ports should be opened and closed?

Report an error

Q4.Which 802.11 standard first introduced the 6 GHz band for Wi-Fi?

Report an error

Q5.A company wants all employee computers to synchronize their clocks with a central time source so that login authentication does not fail. Which server role provides this?

Report an error

Q6.A technician is choosing a monitor cable for a new 4K display. The cable must carry both digital video and audio. Which is the best choice?

Report an error

Q7.A server administrator is choosing RAM for a database server where a single-bit memory error could corrupt financial records. Which type of RAM should be used?

Report an error

Q8.A video editor needs the fastest possible storage for editing 4K footage and has a free PCIe slot. Which storage option gives the highest throughput?

Report an error

Q9.A technician is installing a new CPU and needs to ensure heat transfers efficiently from the CPU to the heat sink. What should be applied between them?

Report an error

Q10.An office printer is shared by 20 users. The IT department wants to track who printed each document for auditing purposes. Which feature should be enabled?

Report an error

Q11.A developer wants to test an application on Windows, macOS, and Linux using a single physical computer. Which solution allows this without buying three computers?

Report an error

Q12.A company is comparing cloud providers. One provider charges for data downloaded from the cloud but not for data uploaded to it. Which terms describe these two directions?

Report an error

Q13.A desktop computer shows no signs of life at all when the power button is pressed — no lights, no fans, no sounds. What should the technician check first?

Report an error

Q14.A computer that has run reliably for years has become unstable, crashing randomly. The technician opens the case and sees several capacitors on the motherboard with bulging, domed tops. What is the most likely cause?

Report an error

Q15.A user reports that their computer is very slow to start programs and files take a long time to open. Task Manager shows the disk at 100% utilization constantly. The drive is a traditional hard disk. Which upgrade would most improve performance?

Report an error

Q16.A projector in a meeting room shuts itself off after about 20 minutes of use and will not restart until it has cooled down. What is the most likely cause?

Report an error

Q17.A user's smartphone battery drains from full to empty in two hours, the phone feels hot, and mobile data usage has spiked. There are no new apps installed. What is the most likely cause?

Report an error

Q18.A network administrator notices that a server's network connection is much slower than expected. The server has a gigabit NIC, but the link is negotiating at 100 Mbps. What is the most likely cause?

Report an error

Q19.A laser printer produces output with vertical lines running down every page. The toner cartridge was recently replaced. What is the most likely cause?

Report an error

Q20.A user tries to print a document but the printer is not listed as available, even though it is powered on and connected to the network. Other users can print to it. What should the technician check first on the affected computer?

Report an error

Q21.A user reports that the trackpad on their laptop is bulging upward and the bottom case is starting to separate. What is the most likely cause, and what should the technician do first?

Report an error

Q22.A company issues laptops to staff who hot-desk. Each desk has an external monitor, keyboard, and wired network connection. Which accessory lets a user connect to all of these with a single cable and charge the laptop at the same time?

Report an error

Q23.A technician is helping a user pair wireless headphones to a phone. The headphones do not appear in the phone's list of available Bluetooth devices. What should the technician check first?

Report an error

Q24.A user has just replaced the SIM card in their phone with an eSIM. Which statement about eSIM is correct?

Report an error

Q25.A user can reach websites by IP address but not by name. The firewall administrator confirms that TCP port 53 is open. What is the most likely cause?

Report an error

Q26.A user reads email on a phone, a laptop, and a tablet, and wants messages marked as read on one device to show as read on the others. Which protocol should the mail client use?

Report an error

Q27.Why does a DNS lookup normally use UDP rather than TCP?

Report an error

Q28.A user's laptop connects to Wi-Fi in the office but the signal is very weak in a meeting room two floors away, even though the access point is new and supports Wi-Fi 6. Which change is most likely to improve coverage in that room?

Report an error

Q29.A user's computer has the IP address 169.254.14.88 and cannot reach the internet. Other computers on the same network work fine. What is the most likely cause?

Report an error

Q30.An administrator wants to separate guest Wi-Fi traffic from the company's internal servers so guests cannot reach the servers. Which technology provides this separation?

Report an error

Q31.A technician needs to install a wireless access point on a ceiling where there is no power outlet nearby. The switch in the wiring closet supports PoE. What is the best solution?

Report an error

Q32.A technician has run a new Ethernet cable through a wall but does not know which port it terminates on at the patch panel. Which tool should be used to identify the correct port?

Report an error

Q33.A small business server needs storage that survives the failure of any single drive and provides good read performance, using three drives. Which RAID level should be used?

Report an error

Q34.A technician is upgrading a desktop that currently has one 8 GB DDR4 module. The user wants 16 GB running in dual-channel mode. What should the technician install?

Report an error

Q35.A graphic designer needs a monitor with accurate colours and wide viewing angles for photo editing. Which panel type is the best choice?

Report an error

Q36.A technician is building a PC with a new Intel CPU. The motherboard box lists an AMD AM5 socket. What is the problem?

Report an error

Q37.A warehouse needs to print delivery notes on three-part carbon-copy paper. Which printer type should be used?

Report an error

Q38.A laser printer has printed 200,000 pages and now produces faded output with lines down the page, even with a new toner cartridge. What maintenance should be performed?

Report an error

Q39.A graphic design studio prints high-quality colour artwork and brochures. Which printer driver language is the best choice?

Report an error

Q40.A user needs to scan a fragile, bound book. Which scanning method should be used?

Report an error

Q41.A security analyst needs to examine a suspicious file without risking the company network. Which approach is safest?

Report an error

Q42.What is the main difference between a virtual machine and a container?

Report an error

Q43.A developer rents a virtual server from a cloud provider, installs Linux on it, and runs a custom application. Which cloud service model is this?

Report an error

Q44.An online shop expects a large spike in traffic during a holiday sale and wants its web servers to scale up automatically, then scale back down when the sale ends. Which cloud characteristic makes this possible?

Report an error

Q45.A desktop powers on — fans spin and lights come on — but the screen stays blank and the computer emits a series of beeps. What should the technician check first?

Report an error

Q46.A user's hard drive has started making a repeated clicking sound, and files are taking much longer to open. What should the technician do first?

Report an error

Q47.A RAID 5 array shows a degraded status, and one drive bay has an amber LED. The array is still accessible. What should the technician do?

Report an error

Q48.A user's laptop shows "limited connectivity" on Wi-Fi. The laptop can see the network but cannot reach the internet or any local server. Other devices on the same network work fine. What is the most likely cause?

Report an error

Q49.A laser printer outputs pages covered in random symbols and strange characters instead of the document. The printer worked correctly yesterday. What is the most likely cause?

Report an error

Q50.A printer keeps pulling several sheets of paper at once, causing frequent misfeeds. What is the most likely cause?

Report an error