A+ Core 2 FAQ

Frequently asked questions about the 220-1202 exam: cost, format, passing score, and how to prepare.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

Frequently Asked Questions

How long does it take to study for A+ Core 2?

Most candidates need 4–8 weeks studying 1–2 hours a day, depending on experience. Core 2 has more material than Core 1 (36 objectives vs 27), so allow at least as much time as you spent on Core 1, even if you passed Core 1 quickly. Hands-on practice with Windows tools and the command line is essential — reading alone is not enough for the scenario questions. Our study planner page has 2-week, 4-week, and 8-week plans.

Do I need to know Linux and macOS for Core 2?

Yes, but at a basic level. The exam tests Linux command-line tools (ls, chmod, grep, apt, and others), common Linux configuration files, and macOS features (Time Machine, FileVault, Disk Utility, file types). You do not need to be a Linux administrator, but you should know the commands in the study guide and what each one does. A few hours with a Linux virtual machine is enough to learn them.

How much scripting do I need to know for Core 2?

Very little actual coding. The scripting objective (4.8) tests recognition: script file types (.bat, .ps1, .vbs, .sh, .js, .py), common use cases (automation, restarts, drive remapping, backups), and risks (malware, accidental system changes). You will not be asked to write a script, only to identify the right script type or use case for a scenario.

What is the best way to practise the command-line tools?

Open Command Prompt on your own Windows PC and run the commands: ipconfig, ping, nslookup, netstat, sfc /scannow, chkdsk (read-only unless you schedule a check), and the others in the study guide. For Linux commands, install a free virtual machine (VirtualBox with Ubuntu) or use Windows Subsystem for Linux. Running each command once teaches more than reading about it five times, and the exam tests recognition of what each command does.

Is the 220-1102 exam still available?

No. The English version of 220-1101 and 220-1102 retired on 25 September 2025. The current exams are 220-1201 and 220-1202 (V15), launched 25 March 2025, and CompTIA estimates they will run until around September 2028. Study material written for 220-1102 is partly out of date — check that any book or course you use is written for the 1200 series.

How long is the A+ certification valid?

Three years from the date you pass the second of the two exams. You can renew by earning 20 continuing education units (CEUs) over the three years plus CompTIA's CE fee, by completing CompTIA's CertMaster CE course, by passing the newest version of the A+ exams, or by earning a higher CompTIA certification such as Network+ or Security+, which automatically renews A+.

Advertisement