CISSP Glossary

Key terms and acronyms for the CISSP exam, explained in plain language.

By Abu Anns · Last updated 20 November 2026Exam version: April 2024 outline (current until 15 April 2027)

ABAC (Attribute-Based Access Control)
An access control model that grants or denies access based on attributes of the user, the resource, and the environment (such as time or location).
ALE (Annualized Loss Expectancy)
The expected monetary loss per year from a risk: ALE = SLE × ARO. Used to justify the cost of security controls.
ARO (Annualized Rate of Occurrence)
The estimated number of times a loss event is expected to occur per year. A once-in-ten-years event has an ARO of 0.1.
Bell-LaPadula model
A confidentiality model with two rules: no read up (a subject cannot read a higher-level object) and no write down (a subject cannot write to a lower-level object).
Biba model
An integrity model with two rules: no read down (a subject cannot read a lower-integrity object) and no write up (a subject cannot write to a higher-integrity object).
BIA (Business Impact Analysis)
The process of identifying critical business functions, their dependencies, and the impact of their disruption; it produces the RTO, RPO and MTD.
CAT (Computerized Adaptive Testing)
An exam format in which the difficulty of each question adapts to the candidate’s previous answers; the CISSP uses CAT with 100–150 items in 3 hours.
CER (Crossover Error Rate)
The point at which a biometric system’s False Acceptance Rate equals its False Rejection Rate; the standard measure for comparing biometric systems. Lower is more accurate.
Chain of custody
The documented record of who handled a piece of evidence, when, and what they did with it. An unbroken chain is required for evidence to be admissible in court.
Clark-Wilson model
An integrity model for commercial systems based on well-formed transactions and separation of duties: data can only be changed through authorised procedures.
CPE (Continuing Professional Education)
Credits earned through professional development activities to maintain an (ISC)² certification; CISSP requires 120 CPEs per three-year cycle.
CRL (Certificate Revocation List)
A list published by a Certificate Authority of certificates that have been revoked before their expiry date.
DAC (Discretionary Access Control)
An access control model in which the owner of a resource decides who may access it.
DAST (Dynamic Application Security Testing)
Security testing of a running application from the outside, simulating an attacker. Contrast with SAST, which analyses source code.
DMARC
Domain-based Message Authentication, Reporting and Conformance: a policy that tells email receivers what to do with messages that fail SPF or DKIM checks.
Due care / due diligence
Due care is doing what a reasonable person would do to protect assets; due diligence is the ongoing verification that those actions remain effective.
HMAC
Hash-based Message Authentication Code: a hash combined with a shared secret key, providing integrity and authentication but not non-repudiation.
Kerberos
A ticket-based authentication protocol using a trusted Key Distribution Center; used by Active Directory. Requires synchronised clocks.
MAC (Mandatory Access Control)
An access control model in which access is determined by centrally enforced security labels that users cannot override.
MTD (Maximum Tolerable Downtime)
The longest a business function can be unavailable before the damage becomes unacceptable. RTO + WRT must be less than MTD.
OCSP (Online Certificate Status Protocol)
A protocol for checking the revocation status of a digital certificate in real time, as an alternative to downloading a CRL.
PFS (Perfect Forward Secrecy)
A property of key exchange (e.g. ephemeral Diffie-Hellman) ensuring that compromise of a long-term private key does not expose past session keys or recorded traffic.
RBAC (Role-Based Access Control)
An access control model in which permissions are assigned to roles and users inherit permissions from their roles.
RPO (Recovery Point Objective)
The maximum acceptable data loss measured in time. An RPO of one hour means backups must occur at least hourly.
RTO (Recovery Time Objective)
The target time within which a business function or system must be restored after a disruption.
SAML
Security Assertion Markup Language: an XML-based standard for exchanging authentication and authorisation assertions between an identity provider and a service provider.
SAST (Static Application Security Testing)
Security testing that analyses source code without executing the application. Contrast with DAST.
SIEM
Security Information and Event Management: a system that centralises logs from many sources, correlates events, and generates alerts.
SLE (Single Loss Expectancy)
The expected monetary loss from a single occurrence of a risk: SLE = Asset Value × Exposure Factor.
SOC 2 Type II
An audit report assessing whether a service provider’s controls operated effectively over a period of time, against the Trust Services Criteria.
STRIDE
A threat modelling framework categorising threats as Spoofing, Tampering, Repudiation, Information disclosure, Denial of service, and Elevation of privilege.
TCB (Trusted Computing Base)
The totality of hardware, firmware and software that enforces a system’s security policy. A smaller TCB is easier to verify.
TGT (Ticket Granting Ticket)
In Kerberos, the ticket issued after initial authentication that allows the user to request service tickets without re-entering credentials.
TOCTOU
Time-of-check to time-of-use: a race condition in which the state of a resource changes between a security check and its use.
WRT (Work Recovery Time)
The time needed to test and verify systems after recovery before they return to normal operation. RTO + WRT must be less than MTD.
Zero trust
A security model that assumes no implicit trust based on network location: every access request is authenticated, authorised and encrypted. Principles: verify explicitly, least privilege, assume breach.
Advertisement