Security+ vs CySA+: Which CompTIA Security Cert First?
Security+ and CySA+ (Cybersecurity Analyst+) are the two most common CompTIA security certifications, and they sit one step apart on the same career ladder. Security+ is the entry point: it proves you understand security fundamentals across the board. CySA+ is the next rung: it proves you can do the day-to-day work of a security analyst — reading logs, triaging vulnerabilities, and responding to incidents. Most people should take Security+ first and CySA+ second, but the details matter: the two exams differ sharply in depth, price, and the experience they assume. One urgent note before you plan around CySA+: the current exam, CS0-003, retires for English-language testing on 22 December 2026, and its successor, CS0-004, launched on 23 June 2026. If you are reading this close to that date, check which version you will sit before you buy study materials.
Security+ vs CySA+ at a glance
| Security+ (SY0-701) | CySA+ (CS0-003) | |
|---|---|---|
| Issued by | CompTIA | CompTIA |
| Level | Foundational / entry-level security | Intermediate / analyst-level |
| Experience recommended | Network+ (or equivalent knowledge) and about 2 years of IT administration experience with a security focus | Security+ (or equivalent knowledge) and about 4 years of hands-on information security experience |
| Exam fee | $439 USD per voucher (CompTIA Store, October 2026) | $439 USD per voucher (after CompTIA's May 2026 price change) |
| Questions | Maximum of 90 | Maximum of 85 |
| Duration | 90 minutes | 165 minutes |
| Pass mark | 750 on a 100–900 scale | 750 on a 100–900 scale |
| Question style | Multiple choice plus performance-based questions (PBQs) in simulated environments | Multiple choice plus longer performance-based questions built around logs, alerts, and scan output |
| Domains | 5 (General Security Concepts, Threats/Vulnerabilities/Mitigations, Security Architecture, Security Operations, Security Program Management) | 4 (Security Operations 33%, Vulnerability Management 30%, Incident Response 20%, Reporting & Communication 17%) |
| Renewal | 50 CEUs over 3 years | 60 CEUs over 3 years |
| Best for | Breaking into cybersecurity; help desk / IT support moving into security; DoD and government roles | SOC analyst and incident response roles; Security+ holders ready for the next step |
Both exams are delivered by Pearson VUE, at a test center or online with a remote proctor. CompTIA raised its exam prices during 2026, so older guides quoting $392 or $404 for either exam are out of date — check the CompTIA Store for the current voucher price before you buy. Also note that Security+ itself is changing: SY0-801 (Security+ V8) launched around 17 November 2026, and SY0-701 stays available in English until 11 June 2027.
What each exam actually tests
Security+ is broad and deliberately shallow in places. Its five domains cover threats and vulnerabilities, security architecture, security operations, identity and access management, risk management, and cryptography — a survey of the whole field. The questions test whether you know what things are, why they matter, and which control fits a given situation. The performance-based questions put you in a simulated environment — configuring a firewall rule, matching attacks to descriptions, analysing a short log — but they are short and guided. It is the certification hiring managers ask for when they want evidence that a candidate understands security at all.
CySA+ is narrower and much deeper. It assumes you already know the Security+ material and tests whether you can use it in an analyst workflow: given a SIEM alert, a vulnerability scan, or a packet capture, what do you do next? The exam's centre of gravity is Security Operations (33%) and Vulnerability Management (30%), and its performance-based questions are longer and less guided — working through a set of logs can absorb a large share of your 165 minutes. Where Security+ asks "what is a SIEM?", CySA+ asks "here is SIEM output; what happened, how bad is it, and what do you do first?" That difference in depth is why CompTIA recommends about four years of hands-on experience before CySA+, against about two for Security+.
Time pressure: the hidden difference
The headline numbers hide a real contrast in pacing. Security+ gives you 90 minutes for up to 90 questions — one minute per question, with no scheduled break. It is a sprint, and candidates who linger on the performance-based questions at the start often run out of time at the end. The standard advice is to do the multiple-choice questions first and come back to the PBQs. CySA+ gives you 165 minutes for up to 85 questions — nearly two minutes per question — which sounds generous until you meet a PBQ built around several pages of logs. The extra time is there because the questions demand more reading and analysis, not because the exam is relaxed. Both exams reward the same discipline: answer what you know, flag what you do not, and return with your remaining time.
Cost and the retake question
Both vouchers currently cost $439 at the CompTIA Store (after CompTIA's 2026 price increases), and a retake costs the full voucher price again. CompTIA also sells a voucher with retake assurance (about $579 for Security+ at the time of writing) — worth considering if you are self-funding and a fail would hurt, though the cheapest strategy is simply to be ready: take a full timed mock test, and do not book the real exam until you are passing mocks comfortably. Both certifications last three years and renew through continuing education units (50 CEUs for Security+, 60 for CySA+) plus CompTIA's annual CE fee — or by passing a higher-level CompTIA exam, which renews the lower ones automatically.
Which one do employers ask for?
Security+ appears in far more job postings than CySA+. It is the baseline security certification: many employers (and US government roles under the DoD 8140 workforce framework) treat it as the minimum credential for any security-adjacent position. If you have no security certification, Security+ is the one that gets your CV past screening. CySA+ appears mainly in postings for SOC analyst, incident responder, and vulnerability management roles — jobs that usually also ask for a few years of experience. Hiring managers read CySA+ as evidence that you can do analyst work, not just talk about it. The practical upshot: Security+ gets you into the field; CySA+ moves you up within it.
Can you skip Security+ and go straight to CySA+?
Technically yes — CompTIA has no formal prerequisite chain, and nothing stops you booking CySA+ first. In practice, almost nobody should. CySA+ assumes the Security+ body of knowledge and builds on it; studying for it without that base means learning two exams' worth of material at once, while paying the same $439 for a harder exam with a longer sitting. The exception is someone who already works in a SOC or incident response role and simply needs the credential to match their experience. For everyone else, the sequence is Security+ first, then 1–2 years of hands-on security work (or intensive lab practice), then CySA+.
The verdict
Take Security+ first if you are breaking into cybersecurity, moving from IT support or networking into security, or applying for roles that list a security certification as a minimum requirement — it is the industry's entry ticket, and this site's free Security+ study guides and mock test cover the full SY0-701 exam. Take CySA+ next if you already hold Security+ (or equivalent knowledge), you work in or are targeting a SOC analyst or incident response role, and you are comfortable reading logs and triaging alerts. Take CySA+ first only if you already do analyst work and need the credential to prove it. And whichever order you choose, check the version dates before you book: CS0-003 retires on 22 December 2026, and SY0-701 retires on 11 June 2027 — match your study materials to the exam you will actually sit.