PMP Glossary
Key terms and acronyms for the PMP exam, explained in plain language.
- Acceptance criteria
- The conditions that a deliverable must meet to be formally accepted by the customer or sponsor.
- Agile
- An iterative, incremental approach to delivering work in short cycles, with frequent feedback and adaptation. About 60% of the current PMP exam reflects agile, adaptive, or hybrid approaches.
- Baseline
- The approved version of a plan (scope, schedule, or cost) against which performance is measured. Baselines change only through formal change control.
- Benefits management plan
- The document describing the expected benefits of a project, how they will be measured, who owns them, and when they are expected. Owned by the sponsor.
- Burndown chart
- An agile chart showing remaining work over time against an ideal line. A line above the ideal means the team is behind.
- Business case
- The documented justification for a project in financial and strategic terms — why this project, why now, and what return is expected. Owned by the sponsor.
- Change control board (CCB)
- The group (or person) with authority to approve or reject change requests, as defined in the change management plan.
- Communication channels
- The paths along which information flows between people. The number of channels for n people is n(n-1)/2.
- Contingency reserve
- Budget (or schedule allowance) held for known risks that may occur. It is part of the cost baseline and is managed by the project manager.
- Cost performance index (CPI)
- EV / AC. Above 1.0 means under budget; below 1.0 means over budget.
- Crashing
- A schedule compression technique that adds resources to critical path activities. It costs more money but does not add risk to the sequence of work.
- Critical path
- The longest sequence of activities through the project network. It determines the shortest possible project duration, and its activities have zero float.
- Earned value (EV)
- The budgeted cost of the work actually completed by a given point. One of the three core values in earned value management, with planned value (PV) and actual cost (AC).
- Earned value management (EVM)
- A method for measuring project performance by comparing planned value, earned value, and actual cost, and forecasting the final outcome.
- Estimate at completion (EAC)
- The forecast total cost of the project at completion. Calculated as AC + (BAC - EV), BAC / CPI, or AC + [(BAC - EV) / (CPI x SPI)], depending on the situation.
- Expected monetary value (EMV)
- Probability multiplied by impact in money terms. Used to quantify risks and to compare options in decision trees.
- Fast tracking
- A schedule compression technique that overlaps sequential activities on the critical path. It costs little but adds risk, because work starts before its predecessor is complete.
- Float (slack)
- The amount of time an activity can be delayed without delaying the project. Activities on the critical path have zero float.
- Gold plating
- Adding extra features that were not requested, because the team thinks the customer will like them. It consumes time and budget and is always wrong on the exam.
- Governance
- The framework of rules, roles, and decision-making processes that controls how a project is run: who decides what, and how the project is overseen.
- Issue
- A problem that has already occurred (or is currently occurring) and needs to be resolved. Tracked in the issue log. Distinct from a risk, which is a future uncertainty.
- Issue log
- The record of project issues, including each issue's owner, priority, status, and resolution.
- Lessons learned register
- The record of what went well, what went badly, and what the organization should do differently, captured throughout the project.
- Management reserve
- Budget held outside the cost baseline for unforeseen work. Controlled by the sponsor, not the project manager.
- Minimum viable product (MVP)
- The smallest version of a product that delivers enough value to be released and to generate learning from real users.
- Monte Carlo simulation
- A quantitative risk technique that runs thousands of random scenarios to produce a probability distribution of possible project outcomes.
- PERT
- Program Evaluation and Review Technique. Expected duration = (O + 4M + P) / 6; standard deviation = (P - O) / 6, where O, M, and P are the optimistic, most likely, and pessimistic estimates.
- Phase gate
- A decision point at the end of a project phase, where the governance body decides whether to continue, change, or stop the project.
- Planned value (PV)
- The budgeted cost of the work scheduled to be done by a given point. One of the three core values in earned value management.
- Product backlog
- The prioritized list of work for an agile product, owned by the product owner. Changes are managed by adding items to the backlog and prioritizing them.
- Project charter
- The document that formally authorizes the project and gives the project manager the authority to apply resources. Issued by the sponsor.
- Project management plan
- The integrated plan for the project, combining subsidiary plans (scope, schedule, cost, quality, resources, communications, risk, procurement, stakeholders) and the three baselines.
- RACI chart
- A responsibility assignment matrix showing who is Responsible, Accountable (exactly one person), Consulted, and Informed for each activity.
- Risk
- An uncertain event that, if it occurs, has a positive or negative effect on project objectives. Negative risks are threats; positive risks are opportunities.
- Risk register
- The record of identified risks, including each risk's cause, probability, impact, owner, and planned response.
- Schedule performance index (SPI)
- EV / PV. Above 1.0 means ahead of schedule; below 1.0 means behind schedule.
- Scope creep
- The uncontrolled expansion of project scope without changes to time, cost, or resources. Always a failure of scope management.
- Servant leadership
- A leadership style in which the leader serves the team — removing obstacles, coaching, and helping people grow — rather than commanding them. The leadership model the PMP exam rewards.
- Sprint
- A short, fixed-length iteration (typically 1-4 weeks) in Scrum, during which the team delivers a working increment of the product.
- Stakeholder
- Anyone who can affect, or is affected by, the project — including the sponsor, customer, team, users, regulators, and the wider organization.
- To-complete performance index (TCPI)
- (BAC - EV) / (BAC - AC). The efficiency the remaining work must achieve to finish on budget. Above 1.0 means the team must perform better than planned.
- Work breakdown structure (WBS)
- A hierarchical, deliverable-oriented decomposition of the total project scope into work packages. It follows the 100% rule: it covers all of the scope, nothing more and nothing less.
- Work package
- The lowest level of the work breakdown structure, where work can be reliably estimated, assigned, and controlled.