AZ-900 FAQ
Frequently asked questions about the AZ-900 exam: cost, format, passing score, and how to prepare.
Frequently Asked Questions
How long should I study for AZ-900?
It depends on your starting point. With IT experience, two weeks at 5–6 hours a week is realistic. If you are new to cloud but technically literate, plan three to four weeks. Complete beginners with a non-technical background should allow four to six weeks. The study planner page on this site lays out 2-, 4-, and 8-week schedules.
Is AZ-900 hard?
It is the gentlest Microsoft certification exam — a foundational, concepts-only test with no hands-on tasks and no code. Most candidates who fail do so because they memorised service names without understanding when to use each service, or because they confused similar tools (for example Azure Policy vs resource locks, or Azure Monitor vs Azure Service Health). The practice questions here target exactly those confusions.
What happens if I fail AZ-900?
You can retake it, paying the full $99 fee again. Microsoft's retake policy requires a 24-hour wait after your first failed attempt and a 14-day wait between each later attempt, with a maximum of five attempts in 12 months from your first attempt. You cannot retake an exam you have already passed.
Can I take AZ-900 online from home?
Yes. The exam is delivered by Pearson VUE either at a test centre or online with live remote proctoring. Online testing requires a quiet room, a webcam, a microphone, and a stable connection, and the proctor checks your workspace before the exam starts. Students and educators can also schedule through Certiport.
Which languages is AZ-900 offered in?
English plus a number of other languages — the current list is shown in the Schedule Exam section of the official exam page on Microsoft Learn. If the exam is not available in your preferred language, you can request an extra 30 minutes to complete it using the English-as-a-second-language process.
Do I need hands-on Azure experience to pass?
Not strictly — the exam tests descriptions, not configuration. But a free Azure account makes the concepts concrete: creating a resource group, a virtual machine, and a storage account once teaches you more about the resource hierarchy than reading about it three times. If you do open an account, set a budget alert first so nothing bills unexpectedly.
What is the difference between AZ-900 and AZ-104?
AZ-900 is the fundamentals exam: concepts only, 45 minutes, $99, no expiry. AZ-104 (Azure Administrator) is the associate exam: it tests actually administering Azure — configuring VMs, networking, storage, and identity — costs $165, runs longer, and the certification expires after one year unless renewed. AZ-900 is the natural preparation for AZ-104, but it is not a prerequisite.
Does AZ-900 cover Microsoft Entra ID or Azure Active Directory?
Microsoft Entra ID. Azure Active Directory was renamed Microsoft Entra ID, and the current exam objectives use the new name throughout. If your study material still says Azure AD everywhere, it is out of date. The same applies to older names elsewhere in the syllabus — the July 2026 objectives are the current reference.
Is there a free official practice test for AZ-900?
Yes. Microsoft offers a free practice assessment for AZ-900, now hosted on AI Skills Navigator (the legacy practice assessments on Microsoft Learn are no longer updated). It shows the real question style and difficulty. Microsoft also provides an exam sandbox where you can try the exam interface and question types before test day.
Can AZ-900 get me a job?
On its own it rarely lands a cloud engineering role, but it does help with entry-level cloud support, help desk, and IT operations roles at employers running Azure, and it is frequently listed as preferred on those postings. Its biggest career value is as the first step toward AZ-104 and beyond. The salary and ROI page gives role-by-role figures with sources.