A+ Core 2 220-1202 Exam Prep

Free CompTIA A+ Core 2 study guides, practice questions with explanations, and a timed mock test — no signup, no paywall.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

A+ Core 2 exam facts

Exam code
220-1202
Exam version
220-1202 (V15, current)
Exam fee
$274 USD
Questions
Maximum of 90 (real exam)
Duration
90 minutes (real exam)
Passing score
700 (on a scale of 100–900)

Exam domains

How the real exam is weighted:

Operating Systems28%
Security28%
Software Troubleshooting23%
Operational Procedures21%

Your readiness

Answer practice questions to see your readiness.

Exam countdown

Set your exam date and we will count down the days for you. Your date is stored only in this browser.

CompTIA A+ Core 2 (exam code 220-1202) is the second of the two exams that make up the CompTIA A+ certification, the industry-standard entry-level credential for IT support roles. Where Core 1 covers hardware and networking, Core 2 covers the software and process side of IT support: operating systems, security, software troubleshooting, and operational procedures. It tests whether you can install and manage Windows, macOS, Linux, and mobile operating systems, protect users and data, diagnose software problems, and work professionally within an IT organization.

You need both Core 1 and Core 2 to earn the A+ certification. Passing only one exam earns you no credential, and both exams must come from the same version series — you cannot mix a V15 Core 2 with an older Core 1. Core 1 (220-1201) covers mobile devices, networking, hardware, virtualization and cloud computing, and hardware and network troubleshooting, and it has its own study package on this site at /aplus-core-1/. You can take the two exams in either order, and most candidates sit them a few weeks apart, often starting with Core 1.

Exam format at a glance

The current version is 220-1202 (V15), launched on 25 March 2025. The previous version, 220-1102, retired on 25 September 2025, so 220-1202 is the only Core 2 exam available. The exam has a maximum of 90 questions and a 90-minute time limit, mixing multiple-choice questions (single and multiple response), drag-and-drop items, and performance-based questions (PBQs) — short simulations such as using a command-line tool, configuring a Windows setting, or ordering the steps of a malware-removal procedure. CompTIA recommends about 12 months of hands-on experience in an IT support specialist role, but there are no formal prerequisites: anyone can book the exam.

Your result is a scaled score from 100 to 900, and the passing score is 700 — higher than Core 1's 675, which is one reason candidates often find Core 2 the harder of the two exams. The scaling means 700 is not simply a percentage of questions answered correctly — CompTIA sets the passing score by statistical analysis and does not publish a conversion from correct answers to scaled score. The exam costs $274 USD per attempt (CompTIA list price; confirm the current price in CompTIA's store before booking, as prices change). It is delivered by Pearson VUE at a test center or as an online proctored exam from home. The A+ certification is valid for three years once you have passed both exams.

The four domains

CompTIA publishes the weight of each domain in the official exam objectives:

DomainWeightWhat it covers
Operating Systems28%OS types and filesystems, installations and upgrades, Windows editions, features and tools, command-line tools, settings, networking, macOS, Linux, applications, cloud productivity tools
Security28%Physical and logical security measures, Windows security settings, wireless security, malware, social engineering, malware removal, hardening, mobile security, data destruction, SOHO network security, browser security
Software Troubleshooting23%Windows OS issues, mobile OS and application issues, mobile security issues, PC security issues
Operational Procedures21%Documentation, change management, backups and recovery, safety, environmental controls, privacy and licensing, professionalism, scripting basics, remote access, AI concepts

Core 2 is remarkably evenly weighted — just seven points separate the largest domain from the smallest — so there is no domain you can safely skip. Operating Systems and Security tie at 28% each and together make up 56% of the exam. Software Troubleshooting is concentrated: only four objectives carry 23% of the exam, and all four are scenario-based, making it the highest-value and least crammable content. Operational Procedures is the most learnable domain — safety, documentation, licensing, and professionalism are largely definitional — but at 21% it is too large to ignore, and technical candidates who skim it lose a fifth of the paper.

Who is this exam for?

Core 2 is aimed at the same audience as Core 1 — help desk technicians, desktop support specialists, field service technicians, and career changers entering IT — but it tests the skills you use once the hardware is working: installing and configuring operating systems, managing user accounts and permissions, removing malware, and following the processes that keep an IT department running. If Core 1 is about the machine, Core 2 is about the environment the machine lives in: the operating system, the user, the network, and the organization. Many candidates find Core 2 more challenging than Core 1 because it covers more material (36 objectives versus Core 1's 27) and because the passing score is higher.

How to use this site to prepare

Work through the eight study guides in order. Each one covers a slice of the official objectives in plain language, with comparison tables where topics overlap (Windows editions, filesystems, malware types, backup methods) and a list of exam traps: the mistakes candidates most often make on that topic. Every guide ends with eight original practice questions written from the official 220-1202 objectives, each with a full explanation of why the correct answer is right and why each wrong answer is wrong. Read the explanations even when you answer correctly — they are where the learning happens.

When you have worked through the guides, take the timed mock test: 50 questions drawn across all four domains in the exam's own weightings, scored by domain so you can see exactly where to go back and re-study. The cheat sheet page collects the Windows command-line tools, Linux commands, and malware-removal steps worth memorizing in the last few days before the exam, and the glossary covers the acronyms CompTIA lists for this exam. A realistic study rhythm is one guide per day with its questions, a mock test at the end of each week, and a final full review of your missed questions in the last week. Our study planner page lays out 2-week, 4-week, and 8-week plans matched to different starting points. Hands-on practice matters more on Core 2 than on Core 1: install Windows in a virtual machine, practise the command-line tools, and work through the Windows administrative tools until you can find each one without thinking.

What comes after Core 2?

Passing Core 2 (together with Core 1) earns you the full A+ certification — the credential employers ask for in entry-level IT support job postings. After A+, the natural next steps are CompTIA Network+ (deeper networking) or Security+ (entry-level cybersecurity), both of which build directly on the security foundations in the Core 2 objectives. Passing a higher CompTIA exam also renews your A+ for another three years, so the certifications fit together neatly. The A+ itself is the entry point: it gets your CV past screening for help desk and desktop support roles, and the operating-system, security, and troubleshooting habits it teaches are the ones you will use every day in your first IT job.

Advertisement

Study guides

Frequently Asked Questions

How much does the A+ Core 2 exam cost?

The 220-1202 exam costs $274 USD per attempt at CompTIA list price (as of late 2026). Each retake costs the full fee again, and CompTIA offers no free retests or retake discounts. Because you need both Core 1 and Core 2 to certify, budget $548 for the pair. Confirm the current price in CompTIA's store before booking, as CompTIA changes prices without notice.

What is the passing score for A+ Core 2?

700 on a scaled score range of 100 to 900 — higher than Core 1's passing score of 675 on the same scale. The score is scaled, so 700 is not a simple percentage of questions answered correctly, and CompTIA does not publish how many correct answers it takes to pass. Each exam is passed on its own, so a high Core 1 score cannot make up for a Core 2 score below 700.

Is Core 2 harder than Core 1?

Most candidates find it harder, for three reasons: the passing score is higher (700 vs 675), there is more material (36 objectives vs 27), and a larger share of the questions are scenario-based rather than recall-based — roughly two-thirds of Core 2 objectives begin with "Given a scenario." The best preparation is hands-on practice with Windows tools and the command line, not just reading.

How many questions are on the Core 2 exam, and how long do I get?

A maximum of 90 questions in 90 minutes — roughly one minute per question. The mix includes multiple-choice (single and multiple response), drag-and-drop, and performance-based questions (PBQs), which are short hands-on simulations such as running a command or configuring a setting. The exact number of questions on your exam form may be fewer than 90.

What happens if I fail Core 2? Can I retake it?

Yes. CompTIA requires no waiting period between your first and second attempt — you can rebook immediately. Before a third or later attempt, you must wait at least 14 calendar days from your last attempt. Every attempt costs the full $274. The retake policy applies per exam code, so failing Core 2 does not affect a Core 1 pass. Once you pass an exam, you cannot retake the same exam code without CompTIA's prior consent.

Does Core 2 cover Windows 10 or Windows 11?

Both. CompTIA's objectives state that versions of Windows not past Microsoft's mainstream support, up to and including Windows 11, are intended content areas. In practice that means Windows 10 and Windows 11 features, tools, and settings — including the Windows 11 hardware requirements (TPM 2.0, UEFI with Secure Boot, 4 GB of RAM) that appear in the Windows editions objective.