PSM I FAQ

Frequently asked questions about the PSM I exam: cost, format, passing score, and how to prepare.

By Abu Anns · Last updated 20 November 2026Exam version: PSM I (Scrum Guide 2020)

Frequently Asked Questions

How much does the PSM I exam cost?

The PSM I assessment costs $200 USD per attempt, plus any applicable local taxes. Each attempt needs a new password, so a retake costs another $200. There is no mandatory course fee and no renewal fee — the $200 is the whole cost of the certification for a self-study candidate who passes first time. Official Scrum.org courses include one free attempt.

How many questions are on the PSM I exam, and what is the passing score?

The exam has 80 questions with a 60-minute time limit — about 45 seconds per question. The passing score is 85%, which means at least 68 correct answers; you can miss no more than 12. Questions are multiple choice, multiple answer, and true/false.

Do I need to take a course before PSM I?

No. Scrum.org states that attendance is not a prerequisite, and there is no experience requirement either. A course is strongly recommended but optional — many candidates pass through self-study using the Scrum Guide and practice questions. Official Scrum.org courses include one free exam attempt, and course attendees who attempt within 14 days of receiving their free password and do not pass are granted a second attempt at no extra cost (confirm current terms when booking).

Does PSM I expire?

No. PSM I is a lifetime certification with no annual renewal fee and no continuing education requirement. This is a key difference from the CSM (Scrum Alliance), which must be renewed every two years with 20 Scrum Education Units and a $100 fee.

What happens if I fail PSM I?

You can retake it as many times as you like — Scrum.org sets no limit on attempts and no waiting period between them. Each new attempt needs a new $200 password. After a failed attempt, Scrum.org gives you a breakdown of your performance by competency area (but not which specific questions you got wrong), which shows you what to re-study.

Is the PSM I exam based on the Scrum Guide 2020?

Yes. The current Scrum Guide is the 2020 edition by Ken Schwaber and Jeff Sutherland, and PSM I tests Scrum as described in it. The 2020 Guide introduced the Product Goal, made the Sprint Goal and Definition of Done formal commitments, and replaced the Development Team with the broader Developers accountability. Study the 2020 version, not the 2017 one.

What is the difference between PSM I and CSM?

PSM I (Scrum.org) is assessment-based: no mandatory course, 80 questions in 60 minutes, 85% to pass, $200 per attempt, lifetime validity. CSM (Scrum Alliance) is course-based: a mandatory 14–16 hour course with a Certified Scrum Trainer, then a 50-question exam (74% to pass) included in the course fee, with renewal every two years (20 SEUs + $100). Both are respected; PSM I suits self-study learners, CSM suits people who want guided classroom learning.

How long should I study for PSM I?

Most candidates need 2–4 weeks of focused study: read the Scrum Guide 2020 several times, work through study guides and practice questions, and take Scrum.org's free Scrum Open practice assessment until you score 100% consistently. Candidates with hands-on Scrum experience often need less time; complete beginners should allow 4–8 weeks. This site's study planner page has 2-week, 4-week, and 8-week plans.

Can I take the PSM I exam in a language other than English?

Yes. The assessment is available in English, Japanese, and Simplified Chinese (through scrum.org.cn). Scrum.org also notes that many candidates successfully use the Google Translate Plugin to take the test in their native language, with official instructions provided — though translation quality is not guaranteed.

What should I do after passing PSM I?

Display your free Credly digital badge on LinkedIn and your CV, then keep learning: PSM II tests advanced Scrum mastery for experienced Scrum Masters, PSPO I covers the Product Owner accountability, and the Professional Scrum with Kanban (PSK I) assessment covers using Kanban with Scrum. Practical experience as a Scrum Master matters more than collecting certificates, so look for opportunities to serve a real team.

Advertisement