Cloud Computing & Cloud Models

AZ-900 AZ-900 · Describe cloud concepts

By Abu Anns · Last updated 20 November 2026Exam version: AZ-900 (skills measured as of July 20, 2026)

What is cloud computing?

Cloud computing is the delivery of computing services — servers, storage, databases, networking, software, analytics, and intelligence — over the internet, offered on a pay-as-you-go basis. Instead of buying and owning physical servers, a company rents access to a provider's datacenters and pays only for what it uses. The "cloud" is not a vague place: it is real hardware, in real buildings, owned and operated by providers such as Microsoft, Amazon, and Google. What is new is the model of access: self-service, on demand, over a network, with usage measured and billed like a utility.

Five characteristics define cloud computing, and the exam expects you to recognise them even though it rarely names them as a list. On-demand self-service means a customer can provision resources (a virtual machine, a database, storage) whenever needed, without asking the provider's staff. Broad network access means those resources are available over the network from phones, laptops, and desktops. Resource pooling means the provider serves many customers from shared physical infrastructure, dynamically assigning resources as demand shifts — this is multi-tenancy, and it is what makes the economics work. Rapid elasticity means capacity can scale out and back in quickly, sometimes automatically, so the service feels unlimited. Measured service means usage is metered, monitored, and billed — which is the foundation of the consumption-based model covered in the next guide.

The three cloud models

The exam tests three cloud models: public, private, and hybrid. Learn them as answers to one question: who owns and shares the infrastructure?

ModelWho owns itWho shares itTypical use
Public cloudThe cloud providerMany organisations (multi-tenant)Web apps, development and test, unpredictable or spiky workloads, anything where low upfront cost matters
Private cloudOne organisation (on its premises or hosted by a third party for its exclusive use)Nobody — dedicated to one organisationStrict regulatory or data-residency requirements, legacy systems that cannot move, workloads needing full control
Hybrid cloudBoth — a public cloud and a private cloud bound togetherShared where public, dedicated where privateKeeping sensitive data on-premises while bursting into the public cloud, gradual migration, meeting compliance while using cloud scale

Public cloud

In a public cloud, services are offered over the public internet and shared by many customers. You get the lowest upfront cost, near-unlimited scalability, and no hardware to maintain. The trade-off is control: you share infrastructure with other tenants (although your data is isolated from theirs), and you accept the provider's terms for where data lives and how services are configured. Public cloud is the default choice for new applications, for development and test environments you spin up and tear down, and for anything with unpredictable demand — a marketing campaign, a product launch, seasonal retail traffic.

Private cloud

A private cloud is computing resources used exclusively by one organisation. It may sit in the organisation's own datacenter or be hosted by a third party, but either way it is not shared. Organisations choose it when regulations or internal policy demand direct control over data location and access, when legacy applications cannot run on shared infrastructure, or when security requirements go beyond what a public offering provides. The trade-off is cost and effort: the organisation pays for the hardware and the people to run it, and it loses the elasticity of the public cloud — capacity is whatever was bought.

Hybrid cloud

A hybrid cloud combines a public cloud and a private cloud, with technology binding them so data and applications can move between the two. The classic scenario is a company that keeps its customer database on-premises for compliance reasons but runs its public website and its seasonal workloads in the public cloud, with a secure connection between them. Hybrid is also the standard shape of a migration: move workloads one at a time, keep the rest on-premises, and run both during the transition. The exam loves hybrid scenarios — whenever a question describes one foot in the datacenter and one in the cloud, hybrid is the answer.

Worked example: choosing a model

A regional bank wants a new mobile banking app. Regulations require customer account data to stay on infrastructure the bank controls. The app's traffic is unpredictable — it spikes on payday and after marketing campaigns — and the bank does not want to buy servers for peak load that sit idle most of the month. The right design is hybrid: keep the account database in the bank's private cloud, run the app's front end and the spiky workloads in the public cloud, and connect the two securely. Public-only would break the data rule; private-only would mean buying hardware for peaks. This pattern — control where it matters, scale where it pays — is the hybrid story in one sentence.

One term to handle carefully: multi-cloud

You will hear the term multi-cloud: using services from more than one public cloud provider (for example, Azure plus AWS). Multi-cloud is a real strategy, and Azure Arc exists partly to manage it, but it is not one of the three cloud models in the AZ-900 objectives. The exam's models are public, private, and hybrid. If a question asks which model describes using two public clouds, the careful answer is that none of the three models is "multi-cloud" — the scenario is simply two public clouds. Do not let multi-cloud sneak into your list of three.

Why the models matter for the rest of the exam

Almost every later topic assumes you can tell these models apart. The shared responsibility model shifts with the service type, not the cloud model — but the reasons to choose a model (cost, control, compliance, elasticity) come back in the benefits guide, in Azure Arc, and in migration scenarios. When a scenario question gives you a constraint — a regulation, a budget, a traffic pattern — match the constraint to the model: regulation and control point to private, low cost and elasticity point to public, and a mix of both points to hybrid.

A final note on how the exam phrases these ideas. Questions rarely ask "what is a hybrid cloud?" outright. They describe a company — its constraints, its existing datacenter, its traffic — and ask which model fits. The skill is pattern-matching the story to the model, not reciting a definition. Practise by reading each question twice: first for the constraint (what must stay private? what must scale? what must cost nothing upfront?), then for the model that satisfies it. If two models seem to fit, re-read the constraint — the exam usually hides one decisive detail, such as data that must stay on-premises or a workload that must burst, and that detail picks the model.

Advertisement

Exam traps to watch for

Practice questions

Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.

Q1.A small company stops buying physical servers. Instead, it rents computing services from a provider over the internet and pays only for the resources it uses each month. Which term best describes this arrangement?

Report an error

Q2.A startup is launching a new app. It has almost no capital for hardware, and nobody can predict how much traffic the launch will bring. Which cloud model best fits this situation?

Report an error

Q3.A hospital must keep patient records on infrastructure that is used exclusively by the hospital and is under its direct control, to satisfy healthcare regulations. Which cloud model should the hospital use for these records?

Report an error

Q4.A retailer keeps its payment-processing system in its own datacenter for compliance reasons, but runs its public website and its seasonal marketing workloads in a public cloud, with a secure connection between the two environments. Which cloud model is the retailer using?

Report an error

Q5.Which of the following is NOT one of the three cloud models defined in the AZ-900 exam objectives?

Report an error

Q6.A cloud provider runs thousands of customers' workloads on the same physical servers, dynamically assigning computing resources to whichever customer needs them at any moment. Which cloud characteristic does this describe?

Report an error

Q7.A manufacturing company is migrating to the cloud in stages. Its factory-control systems must stay on-premises, but its email, file storage, and customer portal have already moved to a public cloud, and the two environments are connected. How should the company's current setup be described?

Report an error

Q8.Which statement about the public cloud is correct?

Report an error