A+ Core 1 Glossary

Key terms and acronyms for the 220-1201 exam, explained in plain language.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1201 (V15, current)

ADF (Automatic Document Feeder)
A scanner attachment that feeds multi-page documents through automatically, one page at a time. Used on multifunction printers for scanning or copying stacks of loose pages.
APIPA (Automatic Private IP Addressing)
The address a Windows host assigns itself (169.254.0.0/16) when it cannot reach a DHCP server. An APIPA address is a strong clue that DHCP is failing.
ARM
A CPU architecture designed for power efficiency, used in phones, tablets, and increasingly in laptops. Contrasts with x86/x64, the architecture used in most desktops and servers.
BIOS/UEFI
The firmware that starts a computer and provides low-level hardware settings. UEFI is the modern replacement for legacy BIOS, supporting Secure Boot and larger drives.
CMOS battery
A small coin-cell battery on the motherboard that powers the real-time clock and preserves BIOS settings when the computer is unplugged. When it dies, the date and time reset on every boot.
DHCP (Dynamic Host Configuration Protocol)
The service that automatically assigns IP addresses, subnet masks, gateways, and DNS servers to devices on a network. Uses UDP ports 67 (server) and 68 (client).
DIMM/SODIMM
Memory module form factors: DIMM (dual in-line memory module) for desktops, SODIMM (small outline DIMM) for laptops. They are not interchangeable.
DMARC
Domain-based Message Authentication, Reporting, and Conformance: a DNS TXT record policy telling receiving mail servers what to do with mail that fails SPF or DKIM checks.
DNS (Domain Name System)
The system that translates human-readable domain names into IP addresses. Uses UDP port 53 for normal lookups and TCP for large responses.
ECC RAM
Error-correcting code RAM: memory that detects and corrects single-bit errors. Used in servers and workstations where data integrity matters; cannot be mixed with non-ECC RAM.
ESD (Electrostatic Discharge)
A sudden flow of static electricity that can damage sensitive computer components. Prevented with ESD straps, mats, and antistatic bags.
Hypervisor
Software that creates and manages virtual machines. Type 1 (bare-metal) runs directly on hardware; Type 2 (hosted) runs as an application inside an operating system.
IaaS (Infrastructure as a Service)
A cloud service model where the provider supplies virtual machines, storage, and networking, and the customer manages the operating system and applications.
IMAP (Internet Mail Access Protocol)
An email retrieval protocol (port 143) that keeps mail on the server and synchronizes it across devices. Contrasts with POP3, which downloads mail to one device.
IPS (In-Plane Switching)
An LCD panel type with wide viewing angles and accurate colour, preferred for office and creative work. Contrasts with TN (fast, poor colour) and VA (high contrast, slower).
M.2
A small form-factor slot and module standard used for SSDs and wireless cards, plugging directly into the motherboard. M.2 SSDs may use SATA or the much faster NVMe interface.
MDM (Mobile Device Management)
Software for managing fleets of mobile devices: pushing configurations, enforcing policies, distributing apps, and remotely wiping lost or stolen devices.
NVMe (Non-Volatile Memory Express)
A storage interface designed for SSDs, running over PCIe. Far faster than SATA (several GB/s vs about 600 MB/s).
OLED
Organic light-emitting diode: a display technology in which each pixel produces its own light, giving perfect blacks and high contrast. Can suffer burn-in from static images.
PaaS (Platform as a Service)
A cloud service model where the provider manages the operating system and runtime, and the customer deploys applications onto the platform.
PCL (Printer Control Language)
A printer language developed by HP, widely used for general office printing. Contrasts with PostScript, which is preferred for graphics and desktop publishing.
PoE (Power over Ethernet)
Technology that delivers electrical power over Ethernet cables, powering access points, IP phones, and cameras without a separate power supply. 802.3af (15.4W), 802.3at/PoE+ (30W), 802.3bt/PoE++ (60–100W).
POP3 (Post Office Protocol 3)
An email retrieval protocol (port 110) that downloads mail to one device and usually deletes it from the server. Contrasts with IMAP, which keeps mail on the server.
POST (Power-On Self-Test)
The diagnostic sequence a computer runs at startup to check hardware. Failures are reported with beep codes or on-screen messages.
RAID (Redundant Array of Independent Disks)
A way of combining multiple drives for speed, redundancy, or both. RAID 0 stripes (no redundancy), RAID 1 mirrors, RAID 5 stripes with parity, RAID 6 uses double parity, RAID 10 mirrors and stripes.
RDP (Remote Desktop Protocol)
Microsoft's protocol (TCP port 3389) for remote graphical access to a Windows computer.
S.M.A.R.T.
Self-Monitoring, Analysis, and Reporting Technology: a drive self-diagnostic system that predicts drive failure. A S.M.A.R.T. failure warning means the drive should be replaced promptly.
SaaS (Software as a Service)
A cloud service model where the provider runs a complete application and the customer simply uses it, usually through a web browser. Examples include webmail and online office suites.
SATA
Serial ATA: the standard interface for internal hard drives and SSDs, with a maximum throughput of about 600 MB/s. eSATA is the external variant.
SMTP (Simple Mail Transfer Protocol)
The protocol (port 25) used to send email between mail servers and from a client to its outgoing mail server.
SSH (Secure Shell)
An encrypted protocol (TCP port 22) for remote command-line access. The secure replacement for Telnet, which sends everything in plaintext.
TPM (Trusted Platform Module)
A hardware chip that stores encryption keys and supports security features such as BitLocker drive encryption and Secure Boot.
VDI (Virtual Desktop Infrastructure)
A system in which users' desktop operating systems run as virtual machines on central servers, accessed from thin clients or ordinary PCs.
VLAN (Virtual LAN)
A logical grouping of devices on a switch that behave as if on the same network, isolated from other VLANs. Used to segment traffic for security and performance.
VPN (Virtual Private Network)
An encrypted tunnel over an untrusted network (such as the internet) that lets a remote user access a private network securely.
Advertisement