How it works: the timer starts as soon as this page loads. Answer each question, use the numbered dots to jump around, and flag questions to come back to. You see no feedback until you submit — just like the real exam. The pass guide is 70%: note that some vendors (including AWS) use scaled scoring and do not publish a percentage pass mark, so 70% is a study guide only.
Q1.Scrum's important decisions are based on the perceived state of its three formal artifacts. If an artifact hides the true state of the work, which pillar of empiricism is MOST directly undermined?
Explanation: Transparency requires the emergent process and work to be visible to those performing the work and those receiving it; decisions rest on the perceived state of the artifacts, so a misleading artifact undermines transparency first. Inspection frequency is not the issue. Adaptation concerns changing in response to what is found, which comes after seeing clearly. Courage is a Scrum Value, not a pillar.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Empiricism
Q2.Which statement about adaptation in Scrum is TRUE?
Explanation: If any aspects of a process deviate outside acceptable limits or the resulting product is unacceptable, the process or materials must be adjusted as soon as possible to minimize further deviation — the Scrum Team adapts the moment it learns something new through inspection. Waiting for the Retrospective wastes the feedback loop. Management approval contradicts self-management. And the Sprint Goal is protected during the Sprint, not changed casually.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Empiricism
Q3.A Scrum Team consists of one Product Owner, one Scrum Master, and three Developers — six people in total. Is this consistent with the Scrum Guide?
Explanation: The Guide says the Scrum Team is typically 10 or fewer people and notes that smaller teams communicate better and are more productive; it specifies no minimum size, so a six-person team is fine. There is no seven-person minimum and no five-Developer minimum. The Scrum Master and Product Owner are part of the Scrum Team and count toward its size.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q4.Which of the following is a service the Scrum Master provides to the organization?
Explanation: Serving the organization includes removing barriers between stakeholders and Scrum Teams, along with leading, training, and coaching the organization in Scrum adoption. Product decisions belong to Product Owners and the organization, not the Scrum Master. Budgets are a management function. And the Scrum Master does not assign people to teams.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q5.Two Developers disagree about the best technical approach for an item. They ask the Scrum Master to decide. What should the Scrum Master do?
Explanation: The Developers decide how to do the work — the team is self-managing. The Scrum Master facilitates and coaches rather than deciding technical questions. The Product Owner owns value decisions, not technical approaches. Escalating to a manager removes the decision from the team and undermines self-management.
Exam objective: PSM I Focus Area: Developing People and Teams — Facilitation
Q6.Which of the following is NOT part of effective Product Backlog management, for which the Product Owner is accountable?
Explanation: Effective Product Backlog management includes developing and communicating the Product Goal, creating and communicating items, ordering items, and ensuring the backlog is transparent, visible, and understood. Assigning items to Developers is not part of it — the Developers are self-managing and decide who does what.
Exam objective: PSM I Focus Area: Managing Products with Agility — Product Backlog Management
Q7.Which statement about the Product Owner's decisions is TRUE?
Explanation: For Product Owners to succeed, the entire organization must respect their decisions, which are visible in the content and ordering of the Product Backlog and through the inspectable Increment at the Sprint Review. Developers cannot vote to overrule the Product Owner. The decisions are not time-limited to a Sprint. And the Scrum Master does not approve the Product Owner's decisions.
Exam objective: PSM I Focus Area: Managing Products with Agility — Product Backlog Management
Q8.Which of the following is something the Developers are ALWAYS accountable for?
Explanation: The Developers are always accountable for creating a plan for the Sprint (the Sprint Backlog), instilling quality by adhering to the Definition of Done, adapting their plan each day toward the Sprint Goal, and holding each other accountable as professionals. Ordering the backlog is the Product Owner's work. Removing impediments and facilitating stakeholder collaboration are Scrum Master services.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q9.Which statement about what happens during a Sprint is TRUE?
Explanation: During the Sprint, no changes are made that would endanger the Sprint Goal; quality does not decrease; the Product Backlog is refined as needed; and scope may be clarified and renegotiated with the Product Owner. The backlog is not frozen. Sprint length is fixed. And quality never decreases, even with the Product Owner's agreement.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q10.Which statement about attendance at Sprint Planning is TRUE?
Explanation: The Scrum Team may invite other people to attend Sprint Planning to provide advice, though the plan is created by the Scrum Team's collaborative work. Outsiders are not banned outright. Stakeholders are not required to attend. And management does not run the event.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q11.A Scrum Team runs two-week Sprints. How long should its Sprint Planning usually take?
Explanation: Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint; for shorter Sprints it is usually shorter. The 8-hour maximum is not a fixed duration for every Sprint length. A timebox always applies. And the Guide gives no formula like half the Sprint length — it simply says shorter Sprints usually have shorter planning sessions.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q12.According to the Scrum Guide, the Daily Scrum improves communication, identifies impediments, and promotes quick decision-making. What is the consequence of this?
Explanation: The Daily Scrum improves communication, identifies impediments, promotes quick decision-making, and consequently eliminates the need for other meetings. It does not replace the Retrospective, Sprint Planning, or refinement — those all still happen.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q13.During the Sprint Review, the Scrum Team and stakeholders review what was accomplished in the Sprint and what has changed in their environment. What do they do based on this information?
Explanation: Based on what was accomplished and what has changed, attendees collaborate on what to do next — the Review is a working session, and the Product Backlog may be adjusted to meet new opportunities. There is no acceptance vote. No formal report is required. And the whole backlog is not re-estimated at the Review.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q14.The Sprint Retrospective identifies several improvements. What does the Scrum Guide say about the most impactful ones?
Explanation: The most impactful improvements are addressed as soon as possible and may even be added to the Sprint Backlog for the next Sprint. They are not merely recorded for later review. They are improvements to the way of working, not product features for the Product Backlog. And the self-managing team does not need the Product Owner's approval to improve its own practices.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q15.Which statement about the Product Goal and the Product Backlog is TRUE?
Explanation: The Product Goal is in the Product Backlog, and the rest of the Product Backlog emerges to define what will fulfill the Product Goal. It is not kept separately. The backlog keeps evolving after the goal is set — it is emergent. And the Product Goal is a long-term objective, not something that changes each Sprint like the Sprint Goal.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q16.Which statement BEST describes the Sprint Backlog?
Explanation: The Sprint Backlog is a highly visible, real-time picture of the work the Developers plan to accomplish during the Sprint in order to achieve the Sprint Goal, updated throughout the Sprint as more is learned. It is not a fixed contract. It is not a management status report. And it contains only the selected items and the plan, not the whole Product Backlog.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q17.Which statement about Increments is TRUE?
Explanation: Each Increment is additive to all prior Increments and thoroughly verified, ensuring that all Increments work together. Increments do not replace each other. They must work together — that is why they are verified. And multiple Increments may be created within a Sprint.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q18.A growing Scrum Team wants to appoint a lead Developer to direct the other Developers' work. What does the Scrum Guide say?
Explanation: Within a Scrum Team there are no sub-teams or hierarchies, and the team is self-managing — it internally decides who does what, when, and how. A lead Developer directing others would create exactly the hierarchy the Guide rules out. No lead role is recommended or required at any size, and the Scrum Master does not appoint one.
Exam objective: PSM I Focus Area: Developing People and Teams — Self-Managing Teams
Q19.A Scrum Team decides to skip Sprint Planning for one Sprint because the work seems obvious. What does the Scrum Guide say about this?
Explanation: Each event is a formal opportunity to inspect and adapt, and failure to operate any events as prescribed results in lost opportunities to inspect and adapt. Events are not optional for experienced teams, and no event is singled out as skippable. Delivering an Increment does not excuse skipping the events that make the framework work.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q20.Product Backlog items usually acquire enough transparency to be selected for a Sprint after what?
Explanation: Product Backlog items usually acquire the degree of transparency needed for selection after refining activities — the ongoing work of breaking items down and adding details such as description, order, and size. Management approval is not part of the process. The Product Owner does not estimate items. And the Sprint Review inspects the Increment, it does not prepare backlog items.
Exam objective: PSM I Focus Area: Managing Products with Agility — Product Backlog Management
Q21.Which statement BEST describes empiricism as it is used in Scrum?
Explanation: Empiricism holds that knowledge comes from experience and that decisions should be based on what is observed — this is the foundation Scrum is built on. Detailed upfront planning is the opposite of empiricism: it assumes the future can be fully predicted. Seniority does not define empiricism; observation and experience do. Documentation and auditing are unrelated to the concept.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Empiricism
Q22.A Scrum Team marks Product Backlog items as complete even though the work does not meet the Definition of Done, because they want the Sprint to look successful. Which pillar of empiricism is MOST directly damaged?
Explanation: Marking unfinished work as complete hides the true state of the Increment, so decisions based on it rest on a false picture — that is a transparency failure. Adaptation is not the issue here; the team has not even reached the point of deciding whether to change anything. The Sprint Review length is irrelevant. Courage is a Scrum Value, not a pillar of empiricism, and while fear may be the cause, the pillar damaged is transparency.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Empiricism
Q23.Which of the following is NOT one of the five Scrum Values?
Explanation: The five Scrum Values are commitment, focus, openness, respect, and courage. Efficiency is not among them — it may be a desirable outcome, but it is not a Scrum Value. Commitment, openness, and respect are all genuine Scrum Values, so they cannot be the correct choice for a NOT question.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Values
Q24.Which of the following correctly describes the membership of a Scrum Team?
Explanation: A Scrum Team consists of one Scrum Master, one Product Owner, and Developers — those three accountabilities and nothing else. There is no project manager role in Scrum, and testers are Developers, not a separate group. Stakeholders work with the team but are not part of it. The Scrum Master and Product Owner are inside the team, not external supporters.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q25.A Scrum Team is described as self-managing. What does this mean?
Explanation: Self-managing means the team internally decides who does what, when, and how. The Scrum Master does not manage the Developers' work — that would contradict self-management. The Product Owner orders the Product Backlog but does not assign tasks to Developers. And self-management has nothing to do with skipping events; the five events are still held.
Exam objective: PSM I Focus Area: Developing People and Teams — Self-Managing Teams
Q26.What is the Scrum Master accountable for?
Explanation: The Scrum Master is accountable for establishing Scrum as defined in the Scrum Guide and for the Scrum Team's effectiveness. Maximizing product value and ordering the Product Backlog belong to the Product Owner. Creating the Sprint Backlog and choosing work belongs to the Developers. Approving the Increment is nobody's gate — the Increment is inspected at the Sprint Review, and work counts as part of it when it meets the Definition of Done.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q27.Which statement about the Scrum Master's authority is TRUE?
Explanation: Scrum Masters are true leaders who serve the Scrum Team and the larger organization; they hold no authority over team members. Only the Product Owner can cancel a Sprint. Backlog ordering is the Product Owner's accountability and cannot be overruled by the Scrum Master. Time off and performance reviews are people-management functions that belong outside Scrum entirely.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q28.What is the Product Owner accountable for?
Explanation: The Product Owner is accountable for maximizing the value of the product resulting from the work of the Scrum Team. Establishing Scrum is the Scrum Master's accountability. Creating a usable Increment is the Developers' commitment, shared by the whole team. Removing impediments is the Scrum Master's work.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q29.Who is the ONLY person with the authority to cancel a Sprint?
Explanation: Only the Product Owner has the authority to cancel a Sprint, and only when the Sprint Goal becomes obsolete. The Scrum Master cannot cancel a Sprint even with the team's agreement. Developers cannot vote to cancel. Management has no such authority within the Scrum framework.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q30.Who is responsible for sizing Product Backlog items?
Explanation: The Developers who will do the work are responsible for the sizing. The Product Owner may influence the Developers by helping them understand and select trade-offs, but does not size the work. The Scrum Master facilitates but does not estimate. There is no external estimation role in Scrum.
Exam objective: PSM I Focus Area: Managing Products with Agility — Product Backlog Management
Q31.Which of the following are the Developers ALWAYS accountable for?
Explanation: The Developers are always accountable for creating a plan for the Sprint (the Sprint Backlog), instilling quality by adhering to a Definition of Done, adapting their plan each day toward the Sprint Goal, and holding each other accountable as professionals. Ordering the backlog and defining the Product Goal belong to the Product Owner. The Sprint Review is presented by the whole Scrum Team, not the Developers alone. Removing impediments and coaching the organization are Scrum Master services.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q32.What is the maximum length of a Sprint?
Explanation: Sprints are fixed-length events of one month or less. Two weeks is a common choice but not the maximum. Six weeks exceeds the limit. And the length is not decided fresh each time — it stays consistent throughout the development effort.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q33.Which of the following is a valid reason to cancel a Sprint?
Explanation: A Sprint may be cancelled only if the Sprint Goal becomes obsolete. Being behind schedule is handled by renegotiating scope with the Product Owner, not by cancelling. A stakeholder changing their mind about one feature does not make the Sprint Goal obsolete. A team member's absence is an impediment to adapt to, not a reason to abandon the Sprint.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q34.What is the maximum timebox for Sprint Planning for a one-month Sprint?
Explanation: Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint. Four hours is the maximum for the Sprint Review. Three hours is the maximum for the Sprint Retrospective. Fifteen minutes is the Daily Scrum.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q35.Who decides how many Product Backlog items the Developers select for a Sprint?
Explanation: The Developers select the items and judge what can be Done, drawing on past performance, current capacity, and the Definition of Done. The Product Owner proposes value and orders the backlog but does not decide the amount of work. The Scrum Master does not decide scope. Stakeholders do not select Sprint work.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q36.What is the purpose of the Daily Scrum?
Explanation: The purpose of the Daily Scrum is to inspect progress toward the Sprint Goal and adapt the Sprint Backlog as necessary, adjusting the upcoming planned work. It is not a reporting session for the Product Owner or stakeholders. Tasks are not assigned — the team is self-managing. And re-ordering the Product Backlog is the Product Owner's work, not the Daily Scrum's purpose.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q37.Who participates in the Daily Scrum?
Explanation: The Daily Scrum is an event for the Developers. The Product Owner or Scrum Master participate only if they are actively working on items in the Sprint Backlog, and then they participate as Developers. Stakeholders do not attend. And all Developers participate — it is a team inspection, not a voluntary reporting session.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q38.What is the purpose of the Sprint Review?
Explanation: The purpose of the Sprint Review is to inspect the outcome of the Sprint and determine future adaptations, with the Scrum Team presenting results to key stakeholders and progress toward the Product Goal discussed. It is not a sign-off gate — the Review should never be considered a gate to releasing value. Inspecting how the team worked is the Retrospective's purpose. Planning the next Sprint's work is Sprint Planning's purpose.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q39.Which statement about the Sprint Review is TRUE?
Explanation: The Guide says the Sprint Review is a working session and the Scrum Team should avoid limiting it to a presentation. Stakeholders do not vote to accept or reject the Increment. The Developers attend as part of the Scrum Team presenting results. And an Increment may be delivered to stakeholders prior to the end of the Sprint — the Review is not a gate.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q40.What is the purpose of the Sprint Retrospective?
Explanation: The purpose of the Sprint Retrospective is to plan ways to increase quality and effectiveness, by inspecting how the last Sprint went. Inspecting the Increment with stakeholders is the Sprint Review's purpose. Selecting items for the next Sprint is Sprint Planning. Reporting to management is not a Scrum event at all.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q41.Who attends the Sprint Retrospective?
Explanation: The Sprint Retrospective is attended by the Scrum Team — the Product Owner, the Scrum Master, and the Developers. It is not Developers-only; the Product Owner is part of the team inspecting its own work. Stakeholders do not attend. And the Scrum Master does not hold it alone.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Events
Q42.Which statement BEST describes the Product Backlog?
Explanation: The Product Backlog is an emergent, ordered list of what is needed to improve the product, and the single source of work undertaken by the Scrum Team. It is not fixed — it evolves constantly. It is not a project plan created by the Scrum Master. And the daily task list is the Sprint Backlog, not the Product Backlog.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q43.What is the commitment for the Product Backlog?
Explanation: Each artifact has a commitment: for the Product Backlog it is the Product Goal. The Sprint Goal is the commitment for the Sprint Backlog. The Definition of Done is the commitment for the Increment. The Sprint Backlog is itself an artifact, not a commitment.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q44.What is the Sprint Backlog composed of?
Explanation: The Sprint Backlog is composed of the Sprint Goal (why), the set of Product Backlog items selected for the Sprint (what), and an actionable plan for delivering the Increment (how). The Product Goal and Definition of Done belong to other artifacts. Stakeholders are not part of the Sprint Backlog. And the Sprint Backlog is updated throughout the Sprint, not only at the Review.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q45.What is the commitment for the Sprint Backlog?
Explanation: Each artifact has a commitment: for the Sprint Backlog it is the Sprint Goal. The Product Goal is the commitment for the Product Backlog. The Definition of Done is the commitment for the Increment. The Sprint timebox is a property of the Sprint event, not a commitment.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q46.Which statement BEST describes an Increment?
Explanation: An Increment is a concrete stepping stone toward the Product Goal. Each Increment is additive to all prior Increments and thoroughly verified, ensuring that all Increments work together, and it must be usable to provide value. A task list is the Sprint Backlog's plan. The Scrum Master does not write an Increment report. And unfinished items are not part of an Increment.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Artifacts
Q47.A Product Backlog item is coded and works in a demo, but it has not been tested and does not meet the Definition of Done. Is it part of the Increment?
Explanation: Work cannot be considered part of an Increment unless it meets the Definition of Done — that is a bright line in the Guide. Working in a demo is not enough. The Product Owner cannot waive the Definition of Done. And presenting it as done at the Review would break transparency.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Done
Q48.A company has three Scrum Teams working on one product. Which statement is TRUE?
Explanation: Multiple teams on the same product share the same Product Goal, Product Backlog, and Product Owner. Separate backlogs and Product Owners would split the product. Sprint lengths and Scrum Masters are per-team, not shared. And merging into a 25-person team contradicts the guidance that teams are typically 10 or fewer people.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q49.Which of the following is NOT part of the Scrum framework as defined in the Scrum Guide?
Explanation: There is no project manager role in Scrum — the framework defines three accountabilities (Developers, Product Owner, Scrum Master), five events, and three artifacts. The Sprint Retrospective, the Product Goal, and the Definition of Done are all defined in the Guide.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Team
Q50.Which statement about the Scrum framework is TRUE?
Explanation: Scrum defines three accountabilities (Developers, Product Owner, Scrum Master), five events (Sprint, Sprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective), and three artifacts (Product Backlog, Sprint Backlog, Increment). There is no project manager accountability, no weekly status meeting event, and no project plan artifact.
Exam objective: PSM I Focus Area: Understanding and Applying the Scrum Framework — Scrum Framework