IT Support Certifications
IT support is where most technology careers begin — and CompTIA A+ is the certification employers ask for first.
IT support is the front line of technology: installing and configuring systems, fixing hardware and software problems, setting up networks, and helping people use the tools their work depends on. It is also the most common first job in IT — help desk technician, desktop support, field service technician — and the experience it builds is the foundation for moving into networking, cybersecurity, cloud, or systems administration.
Where to start
The standard entry point is CompTIA A+, the industry's longest-running IT support certification. It is a two-exam certification: Core 1 (220-1201) covers hardware, networking, mobile devices, virtualization, and troubleshooting, while Core 2 (220-1202) covers operating systems, security, software troubleshooting, and operational procedures. You need to pass both exams to earn the certification, and both must be from the same version series — the current exams are the V15 series, launched in March 2025. There are no prerequisites, and CompTIA recommends about 12 months of hands-on experience in an IT support role.
Because A+ is two exams, most candidates study for Core 1 first, sit it, then move on to Core 2 — but the exams can be taken in either order. Our guides are organised the same way, with one package per exam, so you can prepare for each exam on its own and track your readiness separately.
How to study for CompTIA A+
A+ is a practical exam: many questions are scenarios that ask what you should do first, or what the most likely cause of a problem is. Hands-on practice matters more than memorisation — installing an operating system, taking apart a PC, configuring a small office network, and running the command-line tools on your own machine will teach you more than reading about them. Our guides pair every topic with scenario questions and call out the exam's favourite traps, such as the answer that fixes the symptom but skips the step of identifying the problem first.
What Cert Prep Club covers
Each IT support certification on this site gets the full package: study guides for every exam domain, original practice questions with explanations, a timed mock test, a cheat sheet, exam details, a glossary, salary and ROI figures, and a week-by-week study planner. Everything is free, with no account and no paywall.