OS Types, Installations & Windows Editions
A+ Core 2 220-1202 · Operating Systems
The Operating Systems domain is tied with Security as the largest on Core 2 at 28%, and it has 11 objectives — the most of any domain. This guide covers the first three: operating system types and filesystems, OS installations and upgrades, and Windows editions. These are the foundations: if you cannot explain the difference between NTFS and FAT32, or between a clean install and an upgrade, the rest of the domain will be harder than it needs to be.
Operating system types and filesystems
Workstation operating systems are the desktop OSs: Windows (the dominant business desktop OS), macOS (Apple's desktop OS), Linux (open-source, many distributions, common on servers and developer workstations), and Chrome OS (Google's lightweight, browser-centred OS for Chromebooks). Mobile OSs are iOS (iPhone), iPadOS (iPad), and Android (used by many manufacturers). Each has its own app ecosystem, update mechanism, and management tools, and the exam expects you to know which is which — for example, that iOS apps come from the App Store and Android apps from Google Play.
Filesystems determine how data is organized on a drive, and each has limits the exam tests. NTFS (New Technology File System) is the standard Windows filesystem: it supports large files, file permissions, encryption (EFS), and journaling. FAT32 (File Allocation Table 32) is an older filesystem with a 4 GB maximum file size and a 2 TB partition limit (in practice) — still used on USB drives for compatibility, but unsuitable for large files. exFAT (Extensible File Allocation Table) removes FAT32's 4 GB file limit and works on both Windows and macOS, making it the best choice for large external drives shared between platforms. ReFS (Resilient File System) is Microsoft's newer filesystem for servers, designed for data integrity with automatic corruption repair. ext4 (fourth extended filesystem) is the standard Linux filesystem; XFS is another Linux filesystem used for large storage. APFS (Apple File System) is the modern macOS and iOS filesystem, optimized for SSDs.
Vendor life-cycle limitations matter for support: every OS has an end-of-life (EOL) date after which the vendor stops providing security updates, and update limitations mean older hardware may not be able to run newer OS versions. Running an EOL operating system is a security risk, and the exam may ask you to identify it as the cause of a security problem. Compatibility concerns between operating systems include file format differences, application availability (an application written for Windows does not run on macOS without help), and filesystem compatibility (macOS can read NTFS but not write to it without third-party software).
OS installations and upgrades
There are several ways to install an OS. Boot methods include USB drive, network (PXE boot), solid-state/flash drives, internet-based recovery, external or hot-swappable drives, an internal hard drive partition, and multiboot (installing two OSs on one machine and choosing at startup). Types of installations are clean install (wiping the drive and installing fresh — the best option for a new machine or a badly infected one) and upgrade (installing a new OS version over the old one, keeping files and settings). Image deployment installs a pre-configured disk image onto many machines at once; remote network installation deploys over the network; zero-touch deployment automates the whole process with no technician interaction; a recovery partition holds a factory image for restoring the machine; and a repair installation reinstalls the OS while keeping user data.
Partitioning is a key exam topic. GPT (GUID Partition Table) is the modern partitioning scheme: it supports drives over 2 TB, up to 128 partitions, and requires UEFI firmware. MBR (Master Boot Record) is the legacy scheme: it supports drives up to 2 TB and only four primary partitions, and works with legacy BIOS. Windows 11 requires GPT and UEFI. Drive format means formatting a partition with a filesystem before installing the OS. Before any upgrade, the exam lists upgrade considerations: back up files and user preferences, check application and driver support and backward compatibility, check hardware compatibility, review the product life cycle, and plan for feature updates.
Windows editions
Windows 10 and Windows 11 come in several editions with different features. Home is the consumer edition: it cannot join a domain, has no Remote Desktop host, no BitLocker, and no Group Policy Editor. Pro adds domain join, Remote Desktop hosting, BitLocker encryption, and Group Policy Editor (gpedit.msc) — it is the standard business edition. Pro for Workstations adds support for high-end hardware (more CPUs, more RAM, ReFS, persistent memory). Enterprise adds advanced management and security features for large organizations, available through volume licensing. N versions (sold in Europe) are the same editions without Windows Media Player and related media features, due to a European Commission ruling.
The feature differences the exam tests are: domain vs. workgroup (only Pro and above can join a domain; Home uses workgroups), Remote Desktop Protocol (RDP) availability (Pro and above can host RDP sessions; Home can only connect as a client), BitLocker (Pro and above only), gpedit.msc (Pro and above only), and desktop styles/user interface differences. Upgrade paths are in-place upgrade (keeping files and apps) or clean install (wiping and starting fresh); you can upgrade from Home to Pro by purchasing a licence, but you cannot downgrade from Pro to Home without a clean install. Hardware requirements for Windows 11 include a TPM 2.0 chip, UEFI firmware with Secure Boot, at least 4 GB of RAM, and 64 GB of storage — these are the requirements that block older hardware from upgrading, and the exam tests them.
Choosing the right OS and filesystem for the job
The exam often presents a scenario and asks which OS or filesystem fits it. A business desktop that must join a domain and be managed centrally needs Windows Pro. A developer who needs a Unix-like environment with full control over the system will usually choose Linux. A creative professional working with Apple-specific software needs macOS. A school deploying cheap, centrally managed laptops for web-based learning might choose Chrome OS. For storage, the rule of thumb is: NTFS for Windows internal drives, APFS for Mac internal drives, ext4 for Linux, and exFAT for external drives shared between platforms. FAT32 survives only where maximum compatibility matters more than file size — small USB drives, and devices such as cameras and embedded systems that only understand FAT32. When a scenario mentions a specific limit — a file over 4 GB, a drive over 2 TB, a need for file permissions — that limit is usually the clue that identifies the correct answer.
Exam traps to watch for
- Recommending FAT32 for a large external drive: FAT32 has a 4 GB maximum file size. Use exFAT for large files shared between Windows and macOS.
- Saying Windows 11 can install on an MBR disk: Windows 11 requires GPT partitioning and UEFI firmware.
- Assuming Windows Home can join a domain or host Remote Desktop: both need Pro or above, as do BitLocker and Group Policy Editor.
- Confusing a clean install with an upgrade: a clean install wipes everything; an upgrade keeps files and settings. Always back up before either.
Practice questions
Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.
Q1.A user needs to copy a single 8 GB video file onto a USB flash drive that will be used on both Windows and macOS computers. The drive is currently formatted as FAT32. What should the technician do?
Explanation: FAT32 cannot store a file larger than 4 GB, so the 8 GB video would fail to copy. exFAT removes that limit and is readable and writable on both Windows and macOS, making it the right choice for a shared drive. Option A is wrong because the copy would fail at 4 GB. Option D is wrong because macOS can read NTFS but cannot write to it without third-party software. Option C is wrong because exFAT and NTFS both support files far larger than 8 GB.
Exam objective: 220-1202 Objective 1.1: Explain common operating system (OS) types and their purposes
Q2.A technician is installing Windows 11 on a new PC with a 4 TB drive. Which partitioning scheme must be used, and why?
Explanation: GPT supports drives over 2 TB and is required for Windows 11, which also requires UEFI firmware. MBR is limited to 2 TB drives and four primary partitions, so a 4 TB drive cannot be fully used with MBR. Option D is wrong because MBR is the legacy scheme, not the standard for new installations. Option A is wrong because FAT32 is a filesystem, not a partitioning scheme. Option C is wrong because APFS is Apple's filesystem for macOS and iOS, not a Windows partitioning scheme.
Exam objective: 220-1202 Objective 1.2: Given a scenario, perform OS installations and upgrades in a diverse environment
Q3.A small business wants to join its Windows computers to a domain so it can manage them centrally with Group Policy. The computers currently run Windows 11 Home. What is required?
Explanation: Windows Home cannot join an Active Directory domain and does not include the Group Policy Editor (gpedit.msc); both features require Pro or a higher edition. Option C is wrong because domain join is a Pro-and-above feature. Option B is wrong because Group Policy Editor is not available as a Store download for Home — it is an edition feature. Option D is wrong because a workgroup is the opposite of central management; it provides no Group Policy at all.
Exam objective: 220-1202 Objective 1.3: Compare and contrast basic features of Microsoft Windows editions
Q4.A technician is preparing to upgrade a user's PC from Windows 10 to Windows 11. Which step should be done FIRST?
Explanation: Before any OS upgrade, back up files and preferences and verify that the hardware meets the requirements (Windows 11 needs TPM 2.0, UEFI with Secure Boot, and 4 GB of RAM) and that applications and drivers are supported. Option C is wrong because skipping these checks risks data loss and a failed upgrade. Option D is wrong because formatting wipes the user's data — an upgrade is meant to preserve it. Option B is wrong because Windows Update is the mechanism that delivers the upgrade.
Exam objective: 220-1202 Objective 1.2: Given a scenario, perform OS installations and upgrades in a diverse environment
Q5.An IT department needs to deploy the same Windows image, with all standard applications pre-installed, to 100 new computers. Which deployment method is most efficient?
Explanation: Image deployment applies a single pre-configured disk image — OS plus applications and settings — to many machines at once, which is far faster and more consistent than manual installation. Option D is wrong because manual installation on 100 machines would take days and produce inconsistent results. Option A is wrong for the same reason: it repeats the same work 100 times. Option B is wrong because a recovery partition restores a machine to its factory state; it does not deploy a custom corporate image.
Exam objective: 220-1202 Objective 1.2: Given a scenario, perform OS installations and upgrades in a diverse environment
Q6.A user's Windows PC is infected with malware that survives antivirus scans and reinstalls itself after every removal attempt. Which installation type is the most reliable way to eliminate it?
Explanation: A clean install wipes the drive completely and installs a fresh operating system, which is the only reliable way to remove persistent malware that survives other removal methods. Option B is wrong because an in-place upgrade preserves files and settings — including the malware. Option A is wrong because a repair installation also preserves data and may preserve the infection. Option D is wrong because a feature update patches the OS but does not remove existing malware.
Exam objective: 220-1202 Objective 1.2: Given a scenario, perform OS installations and upgrades in a diverse environment
Q7.Which Windows 11 feature requires a TPM 2.0 chip and is NOT available in the Home edition?
Explanation: BitLocker is full-disk encryption that uses the TPM to store encryption keys, and it is available only in Windows Pro and higher editions — not Home. Option B is wrong because Windows Hello is available in Home edition. Option C is wrong because Edge is included in all editions. Option D is wrong because Defender Antivirus is included in all editions.
Exam objective: 220-1202 Objective 1.3: Compare and contrast basic features of Microsoft Windows editions
Q8.A company is still running an operating system that reached end-of-life (EOL) two years ago. What is the main risk?
Explanation: End-of-life means the vendor has stopped releasing security updates (and usually all updates), so vulnerabilities discovered after EOL remain unpatched and the systems become increasingly easy to attack. Option C is wrong because an EOL OS keeps working — it just stops receiving updates. Option B is wrong because internet connectivity is unaffected by EOL status. Option A is wrong because EOL does not delete files.
Exam objective: 220-1202 Objective 1.1: Explain common operating system (OS) types and their purposes