Operational Procedures: Documentation, Safety, Backups & Professionalism

A+ Core 2 220-1202 · Operational Procedures

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

Operational Procedures is the smallest domain on Core 2 at 21%, but it has 10 objectives — the second-highest count — and it covers the widest range of topics: documentation, change management, backups, safety, environmental controls, privacy and licensing, professionalism, scripting, remote access, and artificial intelligence. It is the most learnable domain on the exam: most of the content is definitional, and candidates who read this guide carefully can score well here even with no prior experience.

Documentation and support systems

Ticketing systems are how IT support work is tracked. A good ticket includes user information (who reported the issue), device information (which computer or device), a description of the issue, a category (hardware, software, network), a severity level, escalation levels (when to pass the ticket to a more senior technician), and clear, concise written communication throughout. Asset management tracks the organization's equipment: inventory lists, a configuration management database (CMDB) recording how systems are configured, asset tags and IDs physically attached to devices, the procurement life cycle (purchase to disposal), warranty and licensing information, and assigned users.

Types of documents include incident reports (issue description, progress notes, issue resolution), standard operating procedures (SOPs) (step-by-step instructions for routine tasks), software package custom installation procedures, new user/onboarding setup checklists, user off-boarding checklists, service-level agreements (SLAs) (internal or external/third-party commitments about response and resolution times), and knowledge base articles (documented solutions to common problems, so the same issue does not have to be solved from scratch each time).

Change management and backups

Change management is the process of controlling changes to IT systems so they do not cause unexpected outages. Documented business processes include a rollback plan (how to undo the change if it fails), a backup plan, sandbox testing (testing the change in an isolated environment first), and identifying responsible staff members. Change management records include request forms, the purpose of the change, the scope of the change, the change type (standard change — pre-approved and low-risk; normal change — needs approval; emergency change — urgent, fast-tracked), the date and time of the change, change freezes (periods when no changes are allowed), maintenance windows (scheduled times for changes), affected systems and impact, risk analysis (including risk level), change board approvals, implementation, peer review, and end-user acceptance.

Workstation backup methods include full backups (everything, every time — slowest to run, fastest to restore), incremental backups (only files changed since the last backup of any kind — fastest to run, slowest to restore because all incrementals are needed), differential backups (all files changed since the last full backup — a middle ground), and synthetic full backups (a full backup assembled from a previous full backup plus incrementals, without re-reading the source). Recovery can be in-place/overwrite (restoring to the original location) or to an alternative location. Backup testing (verifying that backups actually restore) and frequency (how often backups run) are as important as the backup itself — an untested backup is not a backup. Backup rotation schemes include onsite vs. offsite storage, grandfather-father-son (GFS) rotation (daily, weekly, and monthly backup sets), and the 3-2-1 backup rule: three copies of the data, on two different types of media, with one copy offsite.

Safety and environmental controls

Electrostatic discharge (ESD) can destroy components: use ESD straps and ESD mats, and store components in antistatic bags. Electrical safety includes equipment grounding and disconnecting power before repairing a PC. Personal safety covers proper lifting techniques, fire safety, safety goggles and air filter masks when appropriate, proper component handling and storage, and cable management (to prevent trips and damage). Compliance with government regulations applies to workplace safety and to the disposal of equipment.

Environmental impacts include Material Safety Data Sheet (MSDS) documentation for handling and disposal of hazardous materials, proper battery disposal, proper toner disposal, and proper disposal of other devices and assets. Power issues include surges (brief voltage spikes), brownouts (voltage drops), and blackouts (total power loss) — mitigated by a surge suppressor (protects against spikes) and an uninterruptible power supply (UPS) (provides battery power during an outage so systems can shut down safely). Temperature, humidity-level awareness, and proper ventilation protect equipment from overheating and condensation, and location and equipment placement and dust cleanup (with compressed air or vacuums designed for electronics) keep systems running.

Privacy, licensing, professionalism, scripting, remote access, and AI

Incident response for prohibited content or activity involves maintaining a chain of custody (documenting who handled evidence and when), informing management or law enforcement as necessary, making a copy of the drive for data integrity and preservation, incident documentation, and understanding the order of volatility (collecting the most changeable evidence, such as RAM contents, first). Licensing and DRM/EULA concepts include valid licences, perpetual licences (buy once, use forever), personal-use vs. corporate-use licences, and open-source licences. Regulated data includes credit card payment information, personal government-issued information, PII (personally identifiable information), healthcare data, and data retention requirements. Acceptable use policies (AUPs), non-disclosure agreements (NDAs/MNDAs), and regulatory and business compliance requirements govern how data and systems may be used.

Communication and professionalism are tested directly: present a professional appearance, use proper language and avoid jargon and slang with customers, set and meet expectations and communicate status, offer repair or replacement options, provide proper documentation, follow up, maintain a positive attitude, actively listen without interrupting, be culturally sensitive, be on time (and contact the customer if late), avoid distractions (personal calls, texting, social media), deal with difficult customers without arguing or being defensive, avoid dismissing or judging customer issues, clarify customer statements with open-ended questions, use discretion when discussing experiences, and handle customers' confidential materials with care.

Scripting basics cover script file types (.bat batch files, .ps1 PowerShell, .vbs VBScript, .sh shell scripts, .js JavaScript, .py Python) and use cases (basic automation, restarting machines, remapping network drives, installing applications, automated backups, gathering information, initiating updates). Risks include unintentionally introducing malware, inadvertently changing system settings, and browser or system crashes from mishandling resources. Remote access technologies include RDP, VPN, VNC (Virtual Network Computer), SSH, RMM (remote monitoring and management), SPICE, WinRM (Windows Remote Management), and third-party tools (screen-sharing, videoconferencing, file transfer, desktop management software) — each with its own security considerations. Artificial intelligence concepts include application integration, policy (appropriate use, plagiarism), limitations (bias, hallucinations, accuracy), and private vs. public AI (data security, data source, data privacy).

Advertisement

Exam traps to watch for

Practice questions

Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.

Q1.A technician is about to replace a motherboard. Which safety equipment should be used to protect the components from electrostatic discharge?

Report an error

Q2.A company backs up its file server every night. It wants the fastest possible nightly backup, and accepts that a restore will take longer because multiple backup sets are needed. Which backup type should be used?

Report an error

Q3.An IT department follows the 3-2-1 backup rule. What does it require?

Report an error

Q4.A technician is planning a major server upgrade. Before implementing the change, what should be prepared in case the upgrade fails?

Report an error

Q5.A technician discovers prohibited content on a user's work computer. What is the correct FIRST action?

Report an error

Q6.A customer is upset because their computer has been in the repair shop for a week. They raise their voice and blame the technician personally. What is the best response?

Report an error

Q7.A technician needs to automate a weekly task: restarting a set of computers and remapping a network drive on each one. Which approach is most appropriate?

Report an error

Q8.A small office experiences frequent brief power outages. The server shuts down abruptly each time, risking data corruption. What should be installed?

Report an error