A+ Core 2 Study Planner

A week-by-week study plan for the 220-1202 exam: 2-week, 4-week, and 8-week schedules.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

How to use this planner

Core 2 has eight study guides. Pick the plan that matches your starting point, and study in guide order — the guides build on each other (operating systems before security, security before security troubleshooting). Each plan ends with a mock test and a review week. Study in focused sessions of 60–90 minutes rather than marathon sessions, and do the practice questions at the end of each guide the same day you read it. Hands-on practice is essential on Core 2: open the Windows tools, run the commands, and work in a virtual machine wherever you can.

2-week plan (experienced — you already work in IT support or passed Core 1 recently)

Days 1–2: OS Types, Installations & Windows Editions + Windows Tools, Command Line, Settings & Networking. Run every command in the guide on your own PC. Days 3–4: macOS, Linux, Applications & Cloud Tools + Security Foundations. Drill the Linux command list and the Windows edition feature table. Days 5–6: Malware, Social Engineering, Hardening & Data Disposal + Troubleshooting Windows & Mobile OS. Memorize the ten-step malware removal procedure. Days 7–8: Troubleshooting Security Issues + Operational Procedures. Day 9: Full timed mock test. Days 10–12: Re-study your weakest domains using the mock score breakdown, and re-do every question you got wrong. Days 13–14: Cheat sheet review, a second mock test, and rest the day before the exam.

4-week plan (some IT background — comfortable with Windows, new to formal study)

Week 1: OS Types, Installations & Windows Editions and Windows Tools, Command Line, Settings & Networking. Set up a virtual machine and practise installing Windows, creating partitions, and running the command-line tools. Week 2: macOS, Linux, Applications & Cloud Tools and Security Foundations. Install Ubuntu in a VM and practise the Linux commands. Week 3: Malware, Social Engineering, Hardening & Data Disposal and Troubleshooting Windows & Mobile OS. Week 4: Troubleshooting Security Issues and Operational Procedures, then the full mock test. Use the remaining days to re-study weak domains and re-do missed questions, finishing with the cheat sheet.

8-week plan (complete beginner — little or no IT background)

Weeks 1–2: OS Types, Installations & Windows Editions and Windows Tools, Command Line, Settings & Networking, one guide per week. Go slowly: read each guide twice, look up every unfamiliar term in the glossary, and practise the hands-on skills (open Task Manager, run ipconfig, explore the Control Panel). Weeks 3–4: macOS, Linux, Applications & Cloud Tools and Security Foundations. Set up a Linux VM and learn the commands by using them. Weeks 5–6: Malware, Social Engineering, Hardening & Data Disposal and Troubleshooting Windows & Mobile OS. Week 7: Troubleshooting Security Issues and Operational Procedures, then your first full mock test. Week 8: Review week — re-study your two weakest domains, re-do all missed questions, review the cheat sheet daily, and take a second mock test mid-week. Book the exam for the end of week 8 so you have a firm deadline.

General advice

Do not skip the Operational Procedures domain: at 21% of the exam it is too large to ignore, and it is the most learnable content on the paper. Do the practice questions under time pressure — the real exam gives you about one minute per question. If you have already passed Core 1 (study package at /aplus-core-1/), start Core 2 within a week or two while your study habits are in place. And remember that the two exams together are the certification: passing Core 2 completes your A+, so finish strong.

Advertisement