CCNA 200-301 Mock Test

50 timed questions · 55 minutes · scored by domain, with re-study links for your weakest areas.

By Abu Anns · Last updated 20 November 2026Exam version: 200-301 v1.1 (current until 2 Feb 2027)

How it works: the timer starts as soon as this page loads. Answer each question, use the numbered dots to jump around, and flag questions to come back to. You see no feedback until you submit — just like the real exam. The pass guide is 70%: note that some vendors (including AWS) use scaled scoring and do not publish a percentage pass mark, so 70% is a study guide only.

55:00
Question 1 of 50

Q1.What is the broadcast address of the 10.10.40.0/21 subnet?

Report an error

Q2.Which address is a valid global unicast IPv6 address?

Report an error

Q3.A host in VLAN 10 (192.168.10.0/24) cannot reach a host in VLAN 20 (192.168.20.0/24). The trunk between the switches carries both VLANs, and the SVIs on the Layer 3 switch are up with correct IP addresses. What should the engineer check first on the VLAN 10 host?

Report an error

Q4.In Rapid PVST+, which port state both forwards frames and learns MAC addresses?

Report an error

Q5.An EtherChannel is configured between two switches. One side is set to LACP active mode and the other side is set to mode on. What is the result?

Report an error

Q6.An engineer needs to manage a router remotely from another building, using an encrypted command-line session. Which management method should be used?

Report an error

Q7.A router learns the network 172.16.0.0/16 from EIGRP (AD 90) and from OSPF (AD 110). Which route is installed in the routing table, and why?

Report an error

Q8.What are the default OSPF hello and dead intervals on a broadcast network?

Report an error

Q9.Which OSPF network statement advertises the 192.168.10.0/24 network into area 0 and enables OSPF on matching interfaces?

Report an error

Q10.A router's table contains 10.10.0.0/16 (static, AD 1) and 10.10.10.0/24 (OSPF, AD 110). A packet arrives for 10.10.10.99. Which route forwards it?

Report an error

Q11.Which first hop redundancy protocol is an open standard that works on equipment from multiple vendors?

Report an error

Q12.A host sends a DNS query to resolve www.example.com. Which protocol and port does the query use?

Report an error

Q13.An SNMP agent needs to send an unsolicited alert (a trap) to the management station when an interface goes down. Which UDP port does the trap use?

Report an error

Q14.An engineer needs an ACL entry that matches the entire 10.0.0.0/8 network as a source. Which wildcard mask is correct?

Report an error

Q15.Which encryption standard does WPA2 use?

Report an error

Q16.An engineer runs service password-encryption on a router and assumes all passwords in the configuration are now strongly protected. Why is this assumption wrong?

Report an error

Q17.A network automation script needs to update the description of an existing VLAN through a controller's REST API. Which HTTP verb should it use?

Report an error

Q18.Which of the following is valid JSON?

Report an error

Q19.A team wants to define its cloud infrastructure — virtual machines, networks, and storage — in version-controlled files, and have a tool create and update that infrastructure automatically. Which tool fits this requirement?

Report an error

Q20.A network engineer needs a device that forwards packets between two different IP subnets and stops broadcast traffic from spreading between them. Which device should be used?

Report an error

Q21.A company is designing a data centre where servers exchange large amounts of traffic with each other, and any server must reach any other server in at most two hops. Which topology best fits this requirement?

Report an error

Q22.A switch receives a unicast frame whose destination MAC address is not in its MAC address table. What does the switch do with the frame?

Report an error

Q23.A link between a switch and a server is up but extremely slow. show interfaces shows a large and growing number of late collisions on the switch port. What is the most likely cause?

Report an error

Q24.A voice-over-IP application needs minimal delay and can tolerate an occasional lost packet. Which transport protocol should it use, and why?

Report an error

Q25.What is the network address of the subnet containing 192.168.5.130/26?

Report an error

Q26.An engineer is subnetting 192.168.1.0/24 with VLSM. The largest department needs 60 hosts. Which subnet should be assigned to it first?

Report an error

Q27.A device with MAC address 00:1a:2b:3c:4d:5e builds its IPv6 interface identifier using modified EUI-64. What is the resulting interface ID?

Report an error

Q28.What does the 802.1Q protocol do on a trunk link?

Report an error

Q29.In a router-on-a-stick design, a router subinterface is configured for VLAN 30 with the command encapsulation dot1Q 30. What is the purpose of this command?

Report an error

Q30.A switch port configured with PortFast receives a BPDU. BPDU guard is enabled on the port. What happens?

Report an error

Q31.An EtherChannel is configured with LACP. One switch port is set to active mode and the other to passive mode. What happens?

Report an error

Q32.What is the role of a wireless LAN controller (WLC) in a lightweight AP deployment?

Report an error

Q33.A branch office has a lightweight AP managed by a central WLC, but local wireless traffic must keep working even if the WAN link to headquarters fails. Which AP mode fits this requirement?

Report an error

Q34.A router has routes to 10.0.0.0/8 via OSPF and to 10.1.1.0/24 via RIP. A packet arrives for 10.1.1.50. Which route does the router use?

Report an error

Q35.A router learns the network 192.168.5.0/24 from OSPF (AD 110) and from RIP (AD 120). Which route is installed in the routing table?

Report an error

Q36.A router receives a packet destined for 203.0.113.44. Its routing table contains a static route to 203.0.113.0/24 (AD 1) and an OSPF route to 203.0.113.32/27 (AD 110). Which route forwards the packet?

Report an error

Q37.An engineer wants a static route to 10.1.1.0/24 to act as a backup that is only used if the OSPF route to the same network fails. Which command achieves this?

Report an error

Q38.Two OSPF routers on the same Ethernet segment have priorities of 1 and 0. Which router can become the DR, and why?

Report an error

Q39.Which first hop redundancy protocol load-balances traffic across all routers in the group, rather than using one active router and idle standbys?

Report an error

Q40.A host with private address 192.168.1.10 accesses the internet through a NAT router, which translates it to public address 203.0.113.5. What is 192.168.1.10 called in NAT terminology?

Report an error

Q41.A DHCP server is on a different subnet from the clients it serves. What must be configured on the router interface facing the clients so they can obtain addresses?

Report an error

Q42.A network engineer configures logging trap 4 on a router. Which syslog severity levels will be sent to the syslog server?

Report an error

Q43.An engineer creates an ACL with a single entry: access-list 10 deny 192.168.1.0 0.0.0.255. The ACL is applied inbound on an interface. What happens to traffic from 10.1.1.5 arriving at that interface?

Report an error

Q44.Which ACL entry permits HTTP traffic from the 192.168.1.0/24 network to any destination?

Report an error

Q45.An organisation wants centralised AAA for router administration, with the entire packet encrypted and separate control over which commands each administrator can run. Which protocol fits?

Report an error

Q46.An attacker connects a rogue DHCP server to a client-facing switch port. Which feature prevents clients from receiving the attacker's DHCP offers?

Report an error

Q47.Which wireless security protocol is considered broken and should never be used?

Report an error

Q48.In a controller-based (SDN) architecture, what is the difference between the control plane and the data plane?

Report an error

Q49.Which HTTP verb is used to retrieve information from a REST API, and which is used to create a new resource?

Report an error

Q50.Which command configures a default static route through the next-hop router at 192.168.1.2?

Report an error