AWS SAA Exam Details

Everything about the SAA-C03 exam: cost, passing score, format, retake policy, renewal, and how to book.

By Abu Anns · Last updated 20 November 2026Exam version: SAA-C03 (current)

Exam overview

The AWS Certified Solutions Architect – Associate exam (code SAA-C03) is the associate-level certification for people who design solutions on Amazon Web Services. It validates your ability to design secure, resilient, high-performing, and cost-optimized architectures using the AWS Well-Architected Framework. SAA-C03 is the current version of the exam: it replaced SAA-C02 in August 2022, and as of October 2026 AWS has announced no successor, so it remains the version to prepare for. AWS recommends about one year of hands-on experience designing solutions on AWS, but there are no formal prerequisites — anyone can register.

Cost

The exam costs $150 USD per attempt, plus any applicable local taxes. Foreign exchange and local pricing may apply depending on where you book. Each retake costs the full $150 again. Two discounts are worth knowing about: passing any AWS certification exam earns you a 50% discount voucher toward your next AWS exam, which many candidates use for their next certification or a recertification attempt. AWS also offers occasional exam vouchers through training programs and events, and the AWS Free Tier and Skill Builder provide low-cost preparation options.

Format and timing

The exam has 65 questions and a 130-minute time limit — exactly two minutes per question, so time management matters. Only 50 of the 65 questions are scored; the other 15 are unscored trial questions that AWS uses to evaluate future exam items. They are not marked in any way, so you must treat every question as if it counts. Question types are multiple choice (one correct answer out of four options) and multiple response (two or more correct answers — the question tells you how many to select). There is no penalty for guessing, so you should answer every question even when you are unsure. You can flag questions and return to them before submitting, which is a good strategy for questions that need more thought: answer the quick ones first, then come back.

Scoring

Your result is reported as a scaled score from 100 to 1,000, and the minimum passing score is 720. The scaling exists because different exam forms vary slightly in difficulty: AWS adjusts raw scores so that a 720 means the same level of competence regardless of which form you took. That means 720 is not simply 72% correct, and AWS does not publish the raw-to-scaled mapping or the number of questions you must answer correctly. Scoring is compensatory: only your overall score matters, so a weak domain can be offset by strong performance elsewhere. You receive a pass/fail result, and if you do not pass, a score report showing your performance by domain so you know where to focus before retaking. AWS does not publish an official pass rate.

The four domains

DomainWeightTask statements
1. Design Secure Architectures30%Secure access to resources; secure workloads and applications; data security controls
2. Design Resilient Architectures26%Scalable and loosely coupled architectures; highly available and fault-tolerant architectures
3. Design High-Performing Architectures24%Storage, compute, database, network, and data ingestion solutions
4. Design Cost-Optimized Architectures20%Cost-optimized storage, compute, database, and network solutions

Security is the largest single domain at 30%, which surprises candidates who expect the exam to focus on compute and storage. In practice the domains overlap: a database question often hinges on encryption, replication, sizing, and pricing all at once.

Retake policy

If you do not pass, you must wait 14 calendar days before retaking the exam, and each retake costs the full $150. There is no limit on the number of attempts. Use the 14-day window for targeted revision: your score report shows which domains were weakest, and this site's guides and mock test are organized by domain so you can drill exactly those areas. If you pass, you cannot retake the same exam for two years — retaking a passed exam is not permitted, since the certification is already earned.

Validity and recertification

The certification is valid for three years from the date you pass. Before it expires, you can recertify in several ways: pass the current version of the Solutions Architect Associate exam again, pass a higher-level exam such as the Solutions Architect Professional (which automatically recertifies the Associate level), or use AWS's renew and maintain options on Skill Builder. AWS sends renewal reminders as the expiration date approaches. If the certification expires, it cannot be renewed — you must pass the exam again to earn it back.

How to book

You book through your AWS Certification account (at aws.training/certification). Create an account if you do not have one, select the SAA-C03 exam, and you will be directed to Pearson VUE, the exam delivery provider, to choose a test center or an online proctored sitting and pay the fee. You can reschedule your appointment up to 24 hours before the exam time. On exam day, bring valid government-issued photo identification as required by Pearson VUE, and arrive early: test centers have check-in procedures, and online proctored exams require a system check, a webcam, and a quiet private room. Personal items, including phones and notes, are not permitted in the testing environment.

Languages and accommodations

The exam is offered in English, French (France), Italian, Japanese, Korean, Portuguese (Brazil), Spanish (Latin America), Spanish (Spain), Simplified Chinese, and Traditional Chinese. AWS has announced that the Italian version will be retired after 31 December 2026. AWS offers exam accommodations, including additional time for candidates whose first language is not English (commonly called ESL +30, adding 30 minutes), which must be requested and approved before you schedule the exam — it cannot be added on exam day. Other accommodations for disabilities are available through the same request process.

What to expect on exam day

Expect scenario-based questions: most present a situation (“A company needs...”) and ask for the best solution among four plausible options. Read the requirement carefully — the correct answer usually turns on one or two words, such as “most cost-effective,” “with the least operational overhead,” or “must not traverse the public internet.” Manage your time: 130 minutes for 65 questions leaves little room for long deliberation, so answer what you know, flag what you do not, and return to flagged questions with your remaining time. Results are typically available within a few days in your AWS Certification account, and your digital badge follows shortly after a pass.

Advertisement