CISSP Cheat Sheet
Quick-reference summary of the key facts for the CISSP exam.
This cheat sheet collects the facts worth memorising in the last few days before the exam. It is a revision aid, not a substitute for the study guides: if any line here is unfamiliar, go back to the guide that explains it before you sit the exam. The highest-value items are the risk formulas, the security model rules, the cryptography pairings, and the CAT format rules.
Exam format (April 2024 outline)
- CAT: 100–150 items, 3 hours, pass 700/1000 scaled. 25 items are unscored pretest. No going back to change answers. Ends at 95% confidence after 100 items, at 150 items, or at 3 hours. Answer at least 75 scored + 25 pretest or it is an automatic fail.
- Fee: US $749 (EUR 719.04 EMEA, GBP 606.69 UK). Retake: 30 days after 1st attempt, 60 after 2nd, 90 after 3rd+; max 4 attempts per 12 months.
- Experience: 5 years in 2+ domains; 1-year waiver (degree or approved credential, only one waiver). Associate of (ISC)²: pass the exam, 6 years to earn the experience. Endorsement within 9 months of passing.
- Maintenance: 3-year cycle, 120 CPEs (90 Group A + 30 A or B), AMF $135/year.
- New outline effective 15 April 2027 — check isc2.org if you are sitting after that date.
Domain weights
1. Security and Risk Management 16% · 2. Asset Security 10% · 3. Security Architecture and Engineering 13% · 4. Communication and Network Security 13% · 5. Identity and Access Management (IAM) 13% · 6. Security Assessment and Testing 12% · 7. Security Operations 13% · 8. Software Development Security 10%
Risk formulas
- SLE = AV × EF · ALE = SLE × ARO · Control value = ALE before − ALE after − control cost
- Risk treatments: mitigate, accept, transfer, avoid (and deter). Transfer moves financial impact, not accountability.
- RTO + WRT < MTD. RPO = maximum acceptable data loss in time.
- STRIDE: Spoofing, Tampering, Repudiation, Information disclosure, Denial of service, Elevation of privilege.
Governance and ethics
- (ISC)² Code of Ethics canon order: 1. Protect society, the commonwealth, and the infrastructure · 2. Act honourably, honestly, justly, responsibly, and legally · 3. Provide diligent and competent service to principals · 4. Advance and protect the profession.
- Policy (mandatory, management intent) > standard (mandatory rules) > procedure (steps) > guideline (recommendation).
- Due care = doing what is reasonable. Due diligence = verifying it stays done.
- GDPR: 72-hour breach notification to the supervisory authority; applies to any organisation processing EU residents' data.
Security models
- Bell-LaPadula = confidentiality: no read up, no write down.
- Biba = integrity: no read down, no write up.
- Clark-Wilson = commercial integrity: well-formed transactions, separation of duties.
- Brewer and Nash (Chinese Wall) = conflicts of interest.
- Reference monitor: mediates all access, tamper-proof, always invoked, verifiable. Security kernel implements it. TCB = all components enforcing policy.
- Fail-secure (fail closed): a failed control blocks access. Open design: security rests on the key, not on secret design (Kerckhoffs).
Cryptography
- Symmetric (one key, fast, bulk data): AES-128/192/256. Asymmetric (key pair, slow, key exchange + signatures): RSA 2048+, ECC 256 (≈ RSA 3072).
- Hashing: SHA-256/SHA-512 current; MD5 and SHA-1 broken. HMAC = integrity + authentication, NOT non-repudiation. Digital signature = authentication + integrity + non-repudiation.
- Diffie-Hellman: key agreement, no authentication alone → man-in-the-middle risk.
- DES, 3DES, RC4 deprecated. ECB mode leaks patterns — avoid. GCM provides authenticated encryption.
- PKI: CA issues X.509 certificates; CRL lists revocations; OCSP checks status in real time. Root CA compromise breaks the whole chain.
- Key escrow: OK for encryption keys (recover data), NEVER for signing keys (destroys non-repudiation).
- Salt defeats rainbow tables. Birthday attack: collisions need ~square root of the hash space. Replay defence: timestamps + nonces.
Networks
- OSI: Physical, Data Link, Network, Transport, Session, Presentation, Application. TCP = reliable, 3-way handshake (SYN, SYN-ACK, ACK). UDP = connectionless, fast.
- Ports: FTP 21, SSH 22, Telnet 23, SMTP 25, DNS 53, HTTP 80, POP3 110, NTP 123, IMAP 143, SNMP 161/162, LDAP 389, HTTPS 443, LDAPS 636, RDP 3389.
- Firewalls: packet filtering (L3/4 headers) < stateful inspection (connection state) < application/proxy (L7) < NGFW (all + IPS + identity). WAF protects web apps at L7.
- IPsec: tunnel mode encrypts the whole packet (site-to-site VPN); transport mode encrypts only the payload (host-to-host). ESP = confidentiality + integrity; AH = integrity only. IKE negotiates keys.
- Wireless: WEP broken, WPA interim, WPA2 (AES-CCMP) minimum, WPA3 current (SAE). Enterprise: 802.1X + RADIUS.
- IDS detects (passive); IPS blocks (inline). Signature-based = known attacks; anomaly-based = novel attacks, more false positives.
- DNSSEC authenticates records; DoH/DoT encrypt queries. SPF authorises senders, DKIM signs messages, DMARC enforces policy. TLS 1.3 current; TLS 1.0/1.1 deprecated. PFS: past sessions stay safe if the private key is later compromised.
Identity and access
- Identification → authentication → authorisation → accountability. MFA = factors from different categories (know, have, are).
- DAC = owner decides. MAC = system enforces labels. RBAC = roles. ABAC = attributes (user, resource, environment).
- SAML = enterprise SSO assertions (XML). OAuth 2.0 = delegated authorisation (NOT authentication). OIDC = authentication on OAuth 2.0 (JWT ID tokens). Kerberos = tickets (TGT + service tickets), needs clock sync (5-min tolerance), KDC is the single point of failure.
- TACACS+ separates AAA, encrypts the full packet (TCP). RADIUS combines auth/authz, encrypts only the password (UDP).
- PAM: vault credentials, just-in-time access, session recording. Deprovision immediately on termination. Privilege creep: fix with RBAC + access reviews.
Assessment, operations, continuity, software
- Vulnerability assessment finds weaknesses; penetration testing exploits them. Black box = no knowledge; white box = full knowledge; grey box = partial.
- SOC 2 Type I = design at a point in time; Type II = operating effectiveness over a period. Auditors report; management remediates.
- Incident response (NIST SP 800-61): Preparation → Detection & Analysis → Containment, Eradication & Recovery → Post-Incident Activity. Contain BEFORE eradicating. People first, then contain, then preserve evidence.
- Forensics: order of volatility — RAM before disk. Write blocker + hash the image + chain of custody. Never work on the original.
- Backup: full (slow to make, fast to restore); incremental (fast to make, slow to restore — needs full + every incremental); differential (needs full + latest differential). 3-2-1 rule: 3 copies, 2 media, 1 offsite.
- Sites: hot (minutes–hours, most expensive), warm (hours–day), cold (days–weeks, cheapest). Match the site to the RTO.
- Fire: pre-action sprinklers for data centres; clean agent gas for server rooms; CO2 lethal to people (unoccupied spaces only). UPS = minutes (bridge to generator); generator = hours/days.
- Biometrics: FAR = wrongly accepted (security failure); FRR = wrongly rejected (usability failure); CER = where they cross — lower CER = more accurate.
- OWASP Top 10 (2021): broken access control, cryptographic failures, injection, insecure design, security misconfiguration, vulnerable components, auth failures, integrity failures, logging failures, SSRF.
- SAST = source code analysis (early, pre-deployment). DAST = testing a running app. SQL injection fix = parameterised queries. XSS fix = output encoding. IDOR fix = server-side authorisation. Secrets never in code — use a secrets manager.
- Data destruction: deletion ≠ destruction. Degaussing = magnetic media only (not SSDs). Crypto erase = destroy the keys. Certificate of destruction from third-party vendors.
The CISSP mindset
Think like a manager, not a technician. The best answer is usually the one that follows the process, engages management, assesses risk before acting, and protects people first. When two answers are both plausible, choose the one that addresses the root cause rather than the symptom — and remember that "accept the risk" and "do nothing yet" are sometimes correct.